Spaceport America Groundbreaking Postponed Until November | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.03.25

AirborneNextGen-
11.04.25

Airborne-Unlimited-11.05.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-10.17.25

Affordable Flying Expo Tickets (Discount Code: AFE2025): CLICK HERE!
LIVE MOSAIC Town Hall, 1800ET, 11.07.25: www.airborne-live.net

Thu, Jan 03, 2008

Spaceport America Groundbreaking Postponed Until November

EIS To Be Redone By Independent Contractor

A scrapped environmental impact statement has forced the groundbreaking for New Mexico's Spaceport America to be delayed to November 2008. But a spaceport official says the opening of the facility is still scheduled for early 2010, to coincide with anchor tenant Virgin Galactic's start of operations.

New Mexico Spaceport Authority Chairwoman Kelly O'Donnell told the Las Cruces (NM) Sun-News the FAA was concerned about a potential conflict of interest in the EIS, which was originally prepared by another state agency -- New Mexico State University's Physical Science Laboratory.

"In that transfer of data, there were some balls dropped, meaning that some of the work that had been done, had to be redone," O'Donnell said. California-based engineering firm Tetra Tech has since been contracted to perform the new EIS.

Groundbreaking was originally targeted for the first quarter of 2008. As ANN reported, designers unveiled sketches of the planned facility last year.

There have already been launches from the site by private companies, but most have not been announced in advance, to keep space buffs and competitors from learning and leaking trade secrets.

FMI: www.spaceportamerica.com, www.tetratech.com/portal/site/TetraTech/

Advertisement

More News

Airborne-NextGen 11.04.25: Anduril YFQ-44A, Merlin SOI 2, UAV Rulemaking Stalled

Also: Horizon Picks P&W PT6A, Army Buys 3 EagleNXT, First Hybrid-Electric Regional, Army Selects AEVEX Anduril Industries’ YFQ-44A Collaborative Combat Aircraft was flown>[...]

NTSB Prelim: Elmore Travis C Searey

While Flying North Along The Beach At About 300 Ft Above Ground Level, The Pilot Reported That The Engine RPM Dropped To About Idle On September 28, 2025, at 1126 eastern daylight >[...]

ANN's Daily Aero-Linx (11.03.25)

Aero Linx: European Association of Aviation Training and Educational Organisations (EATEO) Welcome to the “ European Association of Aviation Training and Education Organizati>[...]

ANN's Daily Aero-Term (11.03.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

Aero-News: Quote of the Day (11.03.25)

“It also gives us the hard data we need to shape requirements, reduce risk, and ensure the CCA program delivers combat capability on a pace and scale that keeps us ahead of t>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC