Northrop Grumman UAV Completes Critical Design Review | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Sat, Dec 03, 2005

Northrop Grumman UAV Completes Critical Design Review

Scheduled To Fly By End Of 2006

Northrop Grumman Corporation tells Aero-News the company has successfully conducted a critical design review of its MQ-8B Fire Scout unmanned aerial vehicle (UAV) for the US Navy.  The review moves the program closer to full-scale production and delivery of the vertical takeoff and landing (VTOL) UAV to the Navy.

"The teamwork shown by the integrated US Navy and Northrop Grumman program team resulted in an excellent and well-coordinated design review," said Cmdr. Rob Murphy, the Navy's team lead for the Fire Scout program. "The long hours of preparation really paid off."

The review brought together the Northrop Grumman Fire Scout team, the Navy and U.S. Army program teams, Navy representatives for Littoral Combat Ship integration and members of the Army's Future Combat System program. Both services have been closely involved in the design to maximize commonality across the Fire Scout platforms.

The technical review process covered every aspect of the UAV to ensure it meets all current and future requirements. Specifically, the review included air-vehicle design, avionics and payload architecture, communications and data links, ship- and land-based launch and recovery and the ability to integrate future payloads onto the aircraft.

"Working with our Navy counterparts, the Fire Scout program continues to mature into a capable and supportable asset for the warfighter," said Doug Fronius, Northrop Grumman's program director for the Navy Fire Scout.
 
Final assembly of the Fire Scout air vehicles will take place at Northrop Grumman's new manufacturing facility in Moss Point, MS. The first airframe is scheduled to arrive there in January from Schweizer Aircraft Corp., a major supplier.

Following assembly, ground testing and first flight are scheduled to be completed in late 2006.

FMI: www.northropgrumman.com

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC