First 10 Satellites In Iridium NEXT Constellation Validated In Orbit | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Fri, Jun 16, 2017

First 10 Satellites In Iridium NEXT Constellation Validated In Orbit

Second Batch Of Satellites Ready For A Launch Scheduled On June 25

Following the launch of the first ten Iridium NEXT satellites in January 2017, their commissioning has proceeded very smoothly, as they passed all in-orbit tests with flying colors.

These satellites are now interconnected, and are operating in full compatibility with the initial Block One constellation.

Having passed this milestone, the second batch of ten satellites is now ready for launch on June 25 by SpaceX from the Vandenberg Air Force base in California.

“The challenge for Thales Alenia Space was not just to deliver the satellites, but above all to commission the entire turnkey system and make sure that the two generations of satellites were fully compatible,” said Bertrand Maureau, Executive Vice President, Telecommunication at Thales Alenia Space. “Our success in this operation clearly confirms our skills and expertise as a leading prime contractor for complex telecommunications systems.”

The Iridium NEXT constellation offers global connectivity thanks to 66 interconnected satellites at an altitude of 780 km, along with nine spares in parking orbit and six more spare satellites on the ground. Totally independent from other any ground network, this international system provides unrivaled capability for communications on the move (individuals, land vehicles, aircraft, ships), and ensures full global coverage, including the oceans.

(Image provided with Thales news release)

FMI: www.thalesgroup.com

Advertisement

More News

ANN's Daily Aero-Term (06.30.25): Ground Stop (GS)

Ground Stop (GS) The GS is a process that requires aircraft that meet a specific criteria to remain on the ground. The criteria may be airport specific, airspace specific, or equip>[...]

ANN's Daily Aero-Linx (06.30.25)

Aero Linx: Australian Transport Safety Bureau (ATSB) The Australian Transport Safety Bureau (ATSB) improves safety and public confidence in aviation, marine and rail transport thro>[...]

Aero-News: Quote of the Day (06.30.25)

“The Palo Alto stopover confirmed—yet again—that flight schools and aero-clubs are no longer just curious about electric training; they are ready to buy. In just >[...]

NTSB Final Report: ICON A5

Pilot’s Failure To Maintain Clearance From The Water While Flying At A Low Altitude Analysis: The flight of two airplanes was in cruise flight on a north heading about 50 ft >[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC