NASA Gears Up For Next Set Of Engine Tests for Space Launch System | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Mon, Apr 21, 2014

NASA Gears Up For Next Set Of Engine Tests for Space Launch System

New Launch Vehicle Engine Actually Has A Lot Of Time In Space

Formerly known as the space shuttle main engine, the RS-25 accumulated over 1 million seconds (that’s about 280 hours) of hot fire experience during 135 missions and numerous related engine tests.

The RS-25 engine that will power NASA's new rocket, the Space Launch System (SLS), off the launch pad and on journeys to an asteroid and Mars is getting ready for the test stand. And it is packing a big punch.

Engineers at NASA's Stennis Space Center near Bay St. Louis, MS, are now focusing their attention on preparing the RS-25 engine after completing testing of the J-2X engine April 10. Four RS-25 engines, previously known as space shuttle main engines, will muscle the core stage of SLS for each of its missions. Towering more than 200 feet tall with a diameter of 27.6 feet, the core stage will store cryogenic liquid hydrogen and liquid oxygen that will feed the vehicle’s RS-25s.

Modifications to the engines, like higher thrust levels, were needed on the proven workhorse to prepare them for the SLS. To accommodate a higher thrust level, the number of engines was increased from three, used during the shuttle era, to four. The power level also was increased for each engine.

Engines on the shuttle ran at 491,000 pounds vacuum thrust (104.5-percent of rated power level). After analyzing temperature and other factors on the engine, the power level was increased for SLS to 512,000 pounds vacuum thrust (109 percent of rated power level).
Modifications also have been made to the A-1 test stand at Stennis to prepare for the RS-25's first hot-fire test.

(Image provided by Aerojet Rocketdyne)

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (05.29.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Term (05.30.25): Very High Frequency (VHF)

Very High Frequency (VHF) The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/grou>[...]

Aero-News: Quote of the Day (05.30.25)

“From approximately November 2021 through January 2022, Britton-Harr, acting on behalf of AeroVanti, entered into lease-purchase agreements for five Piaggio-manufactured airc>[...]

Airborne 05.23.25: Global 8000, Qatar B747 Accepted, Aviation Merit Badge

Also: Virtual FLRAA Prototype, IFR-Capable Autonomous A/C, NS-32 Crew, Golden Dome Missile Defense Bombardier announced that the first production Global 8000 successfully completed>[...]

ANN's Daily Aero-Linx (05.30.25)

Aero Linx: The 1-26 Association (Schweizer) The Association’s goal is to foster the helpfulness, the camaraderie, and the opportunity for head-to-head competition that is fou>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC