Orion In Final Assembly At Kennedy Space Center | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Sat, May 24, 2014

Orion In Final Assembly At Kennedy Space Center

Team Progressing Toward Exploration Flight Test-1

The process of installing the largest heat shield ever to be mated with a spacecraft is underway at the Kennedy Space Center in Florida. Lockheed Martin and NASA engineers have started the process, which marks one of the final steps in the spacecraft's assembly leading up to its first test flight, Exploration Flight Test-1 (EFT-1), later this year.

EFT-1 will provide engineers data about the heat shield's ability to protect the crew module from the extreme 4000-degree heat of reentry and an ocean splashdown following Orion's 20,000 mph reentry from space. In addition, key systems such as avionics, separation events, attitude control and guidance, parachute deployment, and ground operations will be evaluated. Comprehensive data from the test flight will influence design decisions most critical to crew safety to lower risks and safely carry humans on future missions to deep space.

The team remains on schedule to complete the following milestones for the Dec. 4, 2014 launch date:

  • The crew module and service module will mate together and will undergo functional testing
  • The backshell tiles and forward bay cover will be installed onto the crew module
  • The crew module and service module will mate to the Delta IV Heavy second stage adapter
  • The spacecraft will be fueled and serviced at the Kennedy Space Center Payload Hazardous Servicing Facility
  • The launch abort system will be stacked on top of the spacecraft
  • The spacecraft will be prepped and transported to Launch Pad 37 where Lockheed Martin and United Launch Alliance will perform pad integration and launch operations

"This team has done a great job keeping us on track for Orion's first test flight," said Cleon Lacefield, Lockheed Martin vice president and Orion program manager. "That's no easy task when you're designing and building a unique vehicle for human exploration of deep space."

(Image provided by Lockheed Martin)

FMI: www.nasa.gov/orion

Advertisement

More News

ANN's Daily Aero-Term (05.29.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Term (05.30.25): Very High Frequency (VHF)

Very High Frequency (VHF) The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/grou>[...]

Aero-News: Quote of the Day (05.30.25)

“From approximately November 2021 through January 2022, Britton-Harr, acting on behalf of AeroVanti, entered into lease-purchase agreements for five Piaggio-manufactured airc>[...]

Airborne 05.23.25: Global 8000, Qatar B747 Accepted, Aviation Merit Badge

Also: Virtual FLRAA Prototype, IFR-Capable Autonomous A/C, NS-32 Crew, Golden Dome Missile Defense Bombardier announced that the first production Global 8000 successfully completed>[...]

ANN's Daily Aero-Linx (05.30.25)

Aero Linx: The 1-26 Association (Schweizer) The Association’s goal is to foster the helpfulness, the camaraderie, and the opportunity for head-to-head competition that is fou>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC