Gulfstream G650 Logs Some Hours, Passes Initial Flight Tests | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Sat, Dec 05, 2009

Gulfstream G650 Logs Some Hours, Passes Initial Flight Tests

Gulfstream: 'Performs Flawlessly' During Nearly Two-Hour Flight

Gulfstream is providing new details about the G650's successful completion of its first series of flight tests. During a 1-hour and 45-minute flight, G650 project pilot Jake Howard and senior experimental test pilot Tom Horne, along with flight engineer Bill Osborne, tested the aircraft’s handling qualities, engine operability and flap operation.

Additionally, the crew evaluated the aircraft’s pitot-static systems, avionics, hydraulic systems, electrical power generation and distribution, flight controls, and cabin environmental and pressurization controls.

The evaluations were performed at intended airspeeds of up to 240 knots and desired altitudes of up to 9,500 feet. Throughout the flight, personnel from Gulfstream flight test, engineering and flight operations monitored key, real-time data using a new telemetry system configured to downlink more than 2,000 different parameters.

“The pilots’ reports indicate that the G650’s flying qualities were outstanding,” said Pres Henne, senior vice president, Programs, Engineering and Test, Gulfstream. “With its cutting-edge technology, the aircraft performed superbly, as we expected it would. We are very excited to continue our flight-test program and look forward to certification in 2011.”

The G650 flight-test and certification plan involves five aircraft and more than 1,800 hours of testing. Gulfstream is working toward concurrent certification from the Federal Aviation Administration and the European Aviation Safety Agency in 2011.

Gulfstream announced the G650 program on March 13, 2008. On Sept. 29, 2009, the aircraft rolled out under its own power in front of a crowd of more than 7,000 people. It completed its first flight on Nov. 25, 2009, and remains on schedule for entry-into-service in 2012. The G650 is powered by Rolls-Royce BR725 engines, is capable of traveling 7,000 nautical miles at 0.85 Mach and has a maximum operating speed of 0.925 Mach.

FMI: www.gulfstream.com

Advertisement

More News

NTSB Final Report: Douglas A-4K

Pilot Applied Full Aft Stick And Nose-Up Trim, But The Airplane Remained On The Runway Analysis: The pilot reported that a preflight inspection and flight control checks revealed n>[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

Classic Aero-TV: PBY Catalina--From Wartime to Double Sunrise to the Long Sunset

From 2022 (YouTube Edition): Before They’re All Gone... Humankind has been messing about in airplanes for almost 120-years. In that time, thousands of aircraft representing i>[...]

ANN's Daily Aero-Term (07.01.25): Advanced Air Mobility (AAM)

Advanced Air Mobility (AAM) A transportation system that transports people and property by air between two points in the NAS using aircraft with advanced technologies, including el>[...]

ANN's Daily Aero-Linx (07.01.25)

Aero Linx: MQ-1B Predator The MQ-1B Predator is an armed, multi-mission, medium-altitude, long-endurance remotely piloted aircraft that is employed primarily as an intelligence-col>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC