Boeing's Quick-Build 7E7 | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.13.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Thu, Jun 05, 2003

Boeing's Quick-Build 7E7

Three Days?

Chris Stetkiewicz, quite possibly the best heavy-aviation writer not writing for ANN, has latched onto what may be the key to Boeing's future success with its new 7E7 design: it's the ultimate "quick-build" kit.

Boeing isn't worried about meeting any "51% rule," so it has taken its subcontracting experience to the next level: outsourced components will be virtually "snap-together" on the new machine.

Just as Levittown homes popped up in hours sixty years ago, the prefabrication level in Boeing's new ordered assemblies will allow "plug and play" to cover even such things as cockpits, wings, and empennage.

Stetkiewicz noted, "Using a combination of new technology, materials and production processes and unprecedented amounts of sub-contracting, Boeing would slash final assembly times by between 75 percent and 90 percent, said Mike Bair, senior vice president on Boeing's 7E7 project. 'We're trying to get as much of the work down before final assembly so we bring the airplane together in relatively complete pieces and put it together in relatively short time,' Bair told a gathering of business executives in Everett, Washington..."

Mr. Bair went on to say that, while normal final-assembly times are typically over three weeks, three days is within reach, using new techniques and highly-qualified vendors. The new machine is also set to employ extensive composite structures, including the fuselage. That alone is supposed to make possible a cabin altitude of typically 6000 feet, as opposed to the industry-standard 8500, leading to greater passenger comfort. The new plane is full of such innovations, for safety, comfort, and efficiency.

Boeing VP Bair also said a 7E7 could probably be built by a workforce of about 1000 people, a fraction of today's labor requirement.

With labor costs' always rising, with increased governmental demands of employers, with the other advantages of foreign-sourced and machine-made assemblies, the reduction in final assembly time looks like the best option, for Boeing's future.

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.10.24): Takeoff Roll

Takeoff Roll The process whereby an aircraft is aligned with the runway centerline and the aircraft is moving with the intent to take off. For helicopters, this pertains to the act>[...]

Aero-News: Quote of the Day (05.10.24)

“We’re proud of the hard work that went into receiving this validation, and it will be a welcome relief to our customers in the European Union. We couldn’t be mor>[...]

Aero-News: Quote of the Day (05.11.24)

"Aircraft Spruce is pleased to announce the acquisition of the parts distribution operations of Wag-Aero. Wag-Aero was founded in the 1960’s by Dick and Bobbie Wagner in the >[...]

ANN's Daily Aero-Term (05.11.24): IDENT Feature

IDENT Feature The special feature in the Air Traffic Control Radar Beacon System (ATCRBS) equipment. It is used to immediately distinguish one displayed beacon target from other be>[...]

ANN's Daily Aero-Linx (05.11.24)

Aero Linx: Pararescue Air Force Pararescuemen, also known as PJs, are the only DoD elite combat forces specifically organized, trained, equipped, and postured to conduct full spect>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC