AD: Airbus Helicopters | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Thu, Mar 15, 2018

AD: Airbus Helicopters

AD NUMBER: 2018-05-09

PRODUCT: Airbus Helicopters Model AS332C, AS332C1, AS332L, and AS332L1 helicopters.

ACTION: Final Rule.

SUMMARY: This AD requires inspecting the tail rotor (T/R) flapping hinge link (hinge) and reporting the results.

This AD is prompted by a report of a damaged flapping hinge link.

DATES: This AD becomes effective March 26, 2018.

COST: The FAA estimates that this AD affects 20 helicopters of U.S. Registry. The FAA estimates that operators may incur the following costs in order to comply with this AD:

  • At an average labor rate of $85 per hour, inspecting 5 T/R hinges will require 8 hours, and required materials cost would be minimal, for a cost per helicopter of $680 and a cost of $13,600 to the U.S. fleet.
  • Reporting the inspection findings would require about 30 minutes, for a cost per helicopter of $43 and a cost of $860 to the U.S. fleet. If required, dye-penetrant inspecting the spindle bolt or inner ring would require about 1 hour, and required materials cost would be minimal, for a cost per helicopter of $85. If required, replacing a spindle bolt would require about 1 hour, and required parts would cost $625, for a cost per helicopter of $710.
  • If required, replacing the bearing race would require about 1 hour, and required parts would cost $585, for a cost per helicopter of $670.
  • If required, replacing the inner ring would require about 1 hour, and required parts would cost $1,986, for a cost per helicopter of $2,071.
FMI: AD

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC