AD: Airbus Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.20.24

Airborne-NextGen-05.21.24

Airborne-Unlimited-05.15.24 Airborne-AffordableFlyers-05.16.24

Airborne-Unlimited-05.17.24

Sun, Jul 02, 2017

AD: Airbus Airplanes

AD NUMBER: 2017-13-08

PRODUCT: All Airbus Model A318 and A319 series airplanes, Model A320-211, -212, -214, -231, -232, and -233 airplanes, and Model A321-111, -112, -131, -211, -212, -213, -231, and -232 airplanes.

ACTION: Final Rule.

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2015-23-13, for the aircraft listed above.

AD 2015-23-13 required modification of the pin programming of the flight warning computer (FWC) to activate the stop rudder input warning (SRIW) logic; and an inspection to determine the part numbers of the FWC and the flight augmentation computer (FAC), and replacement of the FWC and FAC if necessary.

This new AD, for certain airplanes, also requires accomplishment of additional modification instructions to install the minimum FWC and FAC configuration compatible with SRIW activation. This AD was prompted by a determination that, in specific flight conditions, the allowable load limits on the vertical tail plane could be reached and possibly exceeded.

The FAA estimates that this AD will affect 1,032 airplanes of U.S. registry.

The actions required by AD 2015-23-13, and retained in this AD take about 3 work-hours per product, at an average labor rate of $85 per work-hour. Based on these figures, the estimated cost of the actions that are required by AD 2015-23-13 is $255 per product.

We also estimate that it would take about 3 work-hours per product to comply with the basic requirements of this AD. The average labor rate is $85 per work-hour. Based on these figures, we estimate the cost of this AD on U.S. operators to be $263,160, or $255 per product.

In addition, we estimate that any necessary follow-on actions will take about 6 work-hours (3 work-hours for an FWC and 3 work-hours for an FAC), and require parts costing $88,000 (FAC), for a cost of $88,510 per product. We have no way of determining the number of aircraft that might need these actions.

DATES: This AD is effective August 3, 2017.

FMI: AD

Advertisement

More News

Samson Sky Hits the Wind Tunnel

Improvements Stack as Brand Readies for Mass Production Samson Sky updated followers on its flying car progress, describing some of the travails of the wind tunnel as they get clos>[...]

ANN's Daily Aero-Term (05.22.24): LAHSO

LAHSO An acronym for “Land and Hold Short Operation.” These operations include landing and holding short of an intersecting runway, a taxiway, a predetermined point, or>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

ANN's Daily Aero-Linx (05.19.24)

Aero Linx: Space Medicine Association (SMA) The Space Medicine Branch was founded in 1951 as the first constituent organization of the Aerospace Medical Association (AsMA). In 2006>[...]

ANN's Daily Aero-Term (05.19.24): Back-Taxi

Back-Taxi A term used by air traffic controllers to taxi an aircraft on the runway opposite to the traffic flow. The aircraft may be instructed to back-taxi to the beginning of the>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC