A New Season For Jet Engine Testing In Winnipeg | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Apr 04, 2013

A New Season For Jet Engine Testing In Winnipeg

Canadian Facility Celebrates Its One-Year Anniversary

The GE Aviation Engine Testing, Research and Development Center (TRDC) in Winnipeg, Manitoba just celebrated its one-year anniversary with the completion of updates that will allow the facility to accommodate year-round operations.

The 122,000 square foot facility was initially designed to handle jet engine cold weather and ice-testing, but the site has expanded to include all-weather development and test cycles for engines. The facility is owned by GE, but operated by StandardAero. In 2012, both companies were honored for their collaboration with the prestigious Canadian American Business Council (CABC) Achievement Award.

This past summer, GE Aviation invested $2.5 million in the facility, in conjunction with a $5 million grant from West Canitest R&D Inc., a non-profit with federal government funding designated to assist third-party technology development programs and engine-testing research. This funding was used to incorporate additional testing equipment, a concrete base to allow the wind tunnel to be moved to accommodate different types of testing, digital temperature-catching equipment, and turbulence control structures used to straighten the air coming into the engine for performance testing.
 
“GE is the midst of the highest level of new engine development programs in its history, and the Winnipeg facility with its new year-round capabilities will be a critical part of the new engine development programs,” said Kevin Kanter, manager, Design and Systems Integration Engineering at GE Aviation. “In 2012, this facility ran tests on three engines -- a GE Honda HF120 and two GEnx engines, including 118 hours of testing on the GEnx-1B.”
 
A rigorous test schedule is planned for the facility over the next few years as well, including CFM’s LEAP engine, which will power the Airbus A320neo, the Boeing 737 MAX and China’s C919.

FMI: www.geaviation.com

 


Advertisement

More News

ANN's Daily Aero-Term (12.01.25): Convective SIGMET

Convective SIGMET A weather advisory concerning convective weather significant to the safety of all aircraft. Convective SIGMETs are issued for tornadoes, lines of thunderstorms, e>[...]

ANN's Daily Aero-Linx (12.01.25)

Aero Linx: United Flying Octogenarians WELCOME to a most extraordinary group of aviators, the United Flying Octogenarians (UFO). Founded in 1982 with just a handful of pilots, we h>[...]

NTSB Final Report: Remos Aircraft GmbH Remos GX

Pilot’s Decision To Attempt Takeoff With Frost Covering The Airplane’s Wings Analysis: The pilot of the light sport airplane was preparing to depart for a cross-country>[...]

Aero-News: Quote of the Day (12.02.25)

“We’ve paid for the cable line’s repair for the customer and have apologized for the inconvenience this caused them...” Source: Some followup info from an A>[...]

ANN's Daily Aero-Term (12.02.25): Coupled Approach

Coupled Approach An instrument approach performed by the aircraft autopilot, and/or visually depicted on the flight director, which is receiving position information and/or steerin>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC