NASA Plans Solar Probe Launch In August | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.20.24

Airborne-Unlimited-05.28.24

Airborne-FlightTraining-05.29.24 Airborne-Unlimited-05.30.24

Airborne-Unlimited-05.24.24

Mon, Jul 09, 2018

NASA Plans Solar Probe Launch In August

Parker Solar Probe Will Fly Directly Into The Sun's Atmosphere

NASA is planning an August launch its Parker Solar Probe mission it says will "revolutionize our understanding of the Sun." The launch window will open at about 4 a.m. EDT, with an approximate one-hour duration, no earlier than Saturday, Aug. 4. The spacecraft will launch on a United Launch Alliance Delta IV Heavy rocket from Space Launch Complex 37 at Cape Canaveral Air Force Station (CCAFS) in Florida.

The Parker Solar Probe, about the size of a small car, will provide unprecedented information about our Sun, where changing conditions can spread out into the solar system to affect Earth and other worlds. The spacecraft will fly directly into the Sun's atmosphere where, from a safe distance of approximately 4 million miles from its surface, the spacecraft will trace how energy and heat move through the Sun’s atmosphere and explore what accelerates the solar wind and solar energetic particles.

The Parker Solar Probe is part of NASA’s Living with a Star Program, managed by the agency’s Goddard Space Flight Center in Greenbelt, Maryland, for NASA’s Science Mission Directorate in Washington. The Johns Hopkins Applied Physics Laboratory in Laurel, Maryland, designed, built and manages the mission for NASA.

United Launch Alliance of Centennial, Colorado, is the provider of the Delta IV launch service for Parker Solar Probe. Northrop Grumman is providing the rocket’s fully-integrated third stage. NASA’s Launch Services Program, based at Kennedy, is responsible for launch service acquisition, integration, analysis and launch management.

(Image provided with NASA media release)

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (06.01.24): Hold For Release

Hold For Release Used by ATC to delay an aircraft for traffic management reasons; i.e., weather, traffic volume, etc. Hold for release instructions (including departure delay infor>[...]

ANN's Daily Aero-Linx (06.01.24)

Aero Linx: International Academy of Aviation and Space Medicine (IAASM) The Academy was founded in 1955, with the object of searching for and promoting new knowledge in Aviation an>[...]

Aero-News: Quote of the Day (06.01.24)

“As FedEx begins its journey to restructure under the ‘One FedEx’ strategy, our pilots remind management that there’s still unfinished business to address i>[...]

Airborne 05.31.24: 1Q GA Sales, 200th ALTO LSA, Spitfire Grounding

Also: NATA CEO In Legal Dilemma, WestJet Encore Settle, Drone Bill H.R. 8416, USN Jet Trainer GAMA released their 1Q/24 GA Aircraft Shipment and Billing Report -- with mostly mixed>[...]

ANN's Daily Aero-Term (06.02.24): Mach Technique [ICAO]

Mach Technique [ICAO] Describes a control technique used by air traffic control whereby turbojet aircraft operating successively along suitable routes are cleared to maintain appro>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC