NASA Schedules Second Rocket Test for Artemis Moon Missions | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.06.25

AirborneNextGen-
10.07.25

Airborne-Unlimited-10.08.25

Airborne-FlightTraining-10.09.25

AirborneUnlimited-10.10.25

Tue, Mar 16, 2021

NASA Schedules Second Rocket Test for Artemis Moon Missions

The Hot Fire Is The Eighth And Final Test Of The Green Run Series

NASA is targeting a two-hour test window that opens at 3 p.m. EDT Thursday, March 18, for the second hot fire test of the core stage for the agency’s Space Launch System (SLS) rocket at NASA’s Stennis Space Center near Bay St. Louis, Mississippi.

On test day, engineers will power up all the core stage systems, load more than 700,000 gallons of cryogenic, or supercold, propellant into the tanks, and fire the rocket’s four RS-25 engines at the same time to simulate the stage’s operation during launch, generating 1.6 million pounds of thrust.

The hot fire is the eighth and final test of the Green Run series to ensure the core stage of the SLS rocket is ready to launch Artemis missions to the Moon, beginning with Artemis I. The core stage includes the liquid hydrogen tank and liquid oxygen tank, four RS-25 engines, as well as the computers, electronics, and avionics that serve as the “brains” of the rocket.

The first in a series of increasingly complex missions, Artemis I will test the SLS rocket and Orion spacecraft as an integrated system ahead of crewed flights to the Moon. Under the Artemis program, NASA is working to land the first woman and the next man on the Moon to pave the way for sustainable exploration at the Moon and future missions to Mars.

FMI: www.nasa.gov/artemisprogram/greenrun

Advertisement

More News

ANN's Daily Aero-Term (10.13.25): Homing [ICAO]

Homing [ICAO] The procedure of using the direction-finding equipment of one radio station with the emission of another radio station, where at least one of the stations is mobile, >[...]

ANN's Daily Aero-Linx (10.13.25)

Aero Linx: European Regions Airline Association (ERA) The European Regions Airline Association (ERA) represents a diverse membership of over 50 airlines and more than 150 associate>[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

NTSB Prelim: CubCrafters Carbon Cub

While On Short Final, About 300 Ft, The Pilot Performed A Forced Landing Near Trees On September 7, 2025, about 0932 eastern daylight time, a CubCrafters Carbon Cub EX airplane, N4>[...]

ANN's Daily Aero-Term (10.14.25): Severe Icing

Severe Icing The rate of ice accumulation is such that ice protection systems fail to remove the accumulation of ice and ice accumulates in locations not normally prone to icing, s>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC