AD: Airbus Defense and Space S.A. Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Sep 14, 2018

AD: Airbus Defense and Space S.A. Airplanes

AD NUMBER: 2018-18-10

PRODUCT: All Airbus Defense and Space S.A. Model CN-235, CN-235-100, CN-235-200, CN-235-300, and C-295 airplanes.

ACTION: Final Rule.

SUMMARY:  This AD was prompted by reports that cracks were found on the door mechanism actuator shaft assemblies of the nose landing gear (NLG).

This AD requires repetitive inspections of the NLG door mechanism actuator shaft assemblies having certain part numbers, and corrective actions if necessary.

This AD would also provide an optional terminating action for the repetitive inspections for Model CN-235, CN-235-100, CN-235-200, and CN-235-300 airplanes.

DATES: This AD is effective October 18, 2018.

COST: The FAA estimates that this AD affects 14 airplanes of U.S. registry. The cost of compliance is estimated as follows:

  • Inspections - 21 work-hours × $85 per hour = $1,785 per inspection cycle. Parts - N/A. Total coat $1,785 per aircraft per inspection cycle.
  • Modification for Model CN-235 airplanes - 10 work-hours × $85 per hour = $850. Parts $33,626. Total cost per aircraft - $34,476.
  • Replacement - 14 work-hours × $85 per hour = $1,190. Parts - $18,720. Total cost per aircraft - $19,910.
FMI: AD

Advertisement

More News

Classic Aero-TV: VerdeGo Debuts VH-3 Hybrid-Electric Powerplant

From 2023 (YouTube Edition): New Propulsion Scheme Optimized for AAM Applications Founded in 2017 by Eric Bartsch, Pat Anderson, and Erik Lindbergh (grandson of famed aviation pion>[...]

NTSB Prelim: Grumman American Avn. Corp. AA-5B

During The Initial Climb, The Engine Began To Operate Abnormally And, After About Three Seconds, Experienced A Total Loss Of Power On October 29, 2025, about 1820 Pacific daylight >[...]

ANN's Daily Aero-Linx (12.02.25)

Aero Linx: Women in Aviation International Women in Aviation International is the largest nonprofit organization that envisions a world where the sky is open to all, and where avia>[...]

Aero-News: Quote of the Day (12.02.25)

“We’ve paid for the cable line’s repair for the customer and have apologized for the inconvenience this caused them...” Source: Some followup info from an A>[...]

Aero-News: Quote of the Day (12.03.25)

“We have long warned about the devastating effects of pairing optimization. Multiple times over many months, we highlighted how schedule manipulation, unbalanced schedules, a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC