Boeing 777X Entry Into Service May Be Delayed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-SpecialEpisode-12.15.25

AirborneNextGen-
12.16.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Jun 08, 2019

Boeing 777X Entry Into Service May Be Delayed

Company Working To Resolve Issues With The GE9X Engines, Carbon-Composite Wings

The entry into service of the Boeing 777X may be delayed beyond its projected June, 2020 date due to issues with the GE9X engine and the airplanes carbon-composite wings, according to industry sources.

Reuters reports that Boeing CFO Greg Smith said at a recent conference that while the 2020 EOS is still "the current assumption" there are still some challenges with the GE engine, which that company is working through "so we are having to do some re-testing."

There are two 777X flight test aircraft that are in integrated system testing on the ground, and the next two flight test aircraft are in final assembly, according to Boeing CEO Dennis Muilenburg. The first flight of the airplane had been planned for later this month, but that date may slip as well. Airline sources at an industry meeting in Seoul, South Korea this week said that the issues may delay the first delivery of the 777X to a customer, which is now more likely to be completed late in 2020, and could be a far out as sometime in 2021.

GE is flight testing the engine after a three-month delay necessitated by a problem with its compressor. The GE9X engine is the largest of its type to be developed. The company did not respond to a request for a comment from Reuters.

The 777X would be the largest twin-engine airliner flying. But industry analysts say that demand for widebody jets has been falling due to oversupply, concerns about the economy and trade disputes.

(Images from file)

FMI: Source report

Advertisement

More News

ANN's Daily Aero-Term (12.19.25): Ultrahigh Frequency (UHF)

Ultrahigh Frequency (UHF) The frequency band between 300 and 3,000 MHz. The bank of radio frequencies used for military air/ground voice communications. In some instances this may >[...]

NTSB Prelim: Cirrus Design Corp SR22T

During The 7 Second Descent, There Was Another TAWS Alert At Which Time The Engine Remained At Full Power On October 24, 2025 at 2115 mountain daylight time, a Cirrus SR22T, N740TS>[...]

Classic Aero-TV: The Red Tail Project--Carrying the Torch of the Tuskegee Airmen

From 2009 (YouTube Edition): Educational Organization Aims to Inspire by Sharing Tuskegee Story Founding leader Don Hinz summarized the Red Tail Project’s mission in simple, >[...]

Aero-News: Quote of the Day (12.19.25)

“This feels like an important step since space travel for people with disabilities is still in its very early days... I’m so thankful and hope it inspires a change in m>[...]

Airborne 12.17.25: Skydiver Hooks Tail, Cooper Rotax Mount, NTSB v NDAA

Also: New Katanas, Kern County FD Training, IndiGo’s Botched Roster, MGen. Leavitt Named ERAU Dean The Australian Transportation Safety Bureau (ATSB) has wrapped up its inves>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC