Airlander 10 Will Take Three To Four Months To Repair | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-08.25.25

Airborne-NextGen-08.26.25

AirborneUnlimited-08.27.25

Airborne-AffordableFlyers-08.28.25

AirborneUnlimited-08.22.25

Sun, Sep 11, 2016

Airlander 10 Will Take Three To Four Months To Repair

Aircraft Damaged During Second Test Flight Last Month

It certainly didn't LOOK like much of an accident when the Airlander 10 nosedived into the ground on its second test flight last month, but the damage caused by bumping the ground will take three to four months to repair, according to Hybrid Air Vehicles.

Hybrid Air Vehicles said that the cockpit and hull were damaged when the aircraft impacted the ground in what was described as a "heavy landing", according to a report from ITV. Fortunately, no one was injured in the accident.

The company said that a mooring line from the aircraft did contact a power line prior to the accident, but "no damage was caused to the aircraft and this did not contribute to the heavy landing," the company said in a statement released a few days after the incident.

The U.K. Air Accidents Investigation Branch will conduct an investigation into the incident.

FMI: www.hybridairvehicles.com

Advertisement

More News

ANN's Daily Aero-Linx (08.27.25)

Aero Linx: The American Society of Aerospace Medicine Specialists (ASAMS) The Society is a non-profit organization created to serve as a voice for and represent the professional ne>[...]

ANN's Daily Aero-Term (08.27.25): Class C Service

Class C Service This service provides, in addition to basic radar service, approved separation between IFR and VFR aircraft, and sequencing of VFR aircraft, and sequencing of VFR a>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Airborne-NextGen 08.26.25: Iran UAV Knockoffs, X-37B Spaceplane, Army Training

Also: ERAU Uses UAVs, P550 Group 2 UAS, Starship’s Florida Launches, NASA Missions Chopped The Air Force has put out a call to commission a one-to-one copy of the Iranian-des>[...]

Classic Klyde Morris (08.25.25)

Classic Klyde Morris From 11.07.16 (and Remembering Bob...) FMI: www.klydemorris.com>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC