AD: Gulfstream Aerospace LP Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Wed, Sep 22, 2021

AD: Gulfstream Aerospace LP Airplanes

AD 2021-17-14 Requires Non-Destructive Testing On The Forward (Front) Spar Vertical Stiffener

The FAA is adopting a new airworthiness directive (AD) for certain Gulfstream Aerospace LP Model Gulfstream G280 airplanes.

This AD was prompted by a report that during fullscale fatigue testing, a crack was found in the area of the attachment of the wing rib 0 to the front spar. This AD requires non-destructive testing on the forward (front) spar vertical stiffener and rib 0 for any cracking, installation of a doubler to the forward (front) spar and rib 0 attachment, and repair if necessary, as specified in a Civil Aviation Authority of Israel (CAAI) AD, which is incorporated by reference. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective October 14, 2021.

Supplementary Information: The CAAI, which is the aviation authority for Israel, has issued CAAI AD I-57-2020-06-01, dated January 27, 2021 (CAAI AD I-57-2020-06-01) (also referred to as the MCAI), to correct an unsafe condition for certain Gulfstream Aerospace LP Model Gulfstream G280 airplanes.

The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 by adding an AD that would apply to certain Gulfstream Aerospace LP Model Gulfstream G280 airplanes. The NPRM published in the Federal Register on June 10, 2021 (86 FR 30819). The NPRM was prompted by a report that during full-scale fatigue testing, a crack was found in the area of the attachment of the wing rib 0 to the front spar. The NPRM proposed to require non-destructive testing on the forward (front) spar vertical stiffener and rib 0 for any cracking, installation of a doubler to the forward (front) spar and rib 0 attachment, and repair if necessary, as specified in CAAI AD I-57-2020-06-01.

The FAA is issuing this AD to address any cracking at the area of the wing rib 0 to the front spar, which could affect the structural integrity of the wing. See the MCAI for additional background information.

FMI: www.regulations.gov

Advertisement

More News

Aero-News: Quote of the Day (05.09.24)

"Fly-by-wire flight, coupled with additional capability that are being integrated into ALFA, provide a great foundation for Bell to expand on its autonomous capabilities. This airc>[...]

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Linx (05.09.24)

Aero Linx: B-21 Raider The B-21 Raider will be a dual-capable penetrating strike stealth bomber capable of delivering both conventional and nuclear munitions. The B-21 will form th>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC