AD: General Electric Company Turbofan Engines | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Sat, Jul 24, 2021

AD: General Electric Company Turbofan Engines

AD 2021-14-11 Prompted By An Inspection By The Manufacturer That Revealed Cracking Of The HPT Rotor Stage 1 Disk

The FAA is adopting a new airworthiness directive (AD) for certain General Electric Company (GE) CF6-80A and CF6-80C2 model turbofan engines.

This AD was prompted by an inspection by the manufacturer that revealed cracking of the high-pressure turbine (HPT) rotor stage 1 disk. This AD requires visual inspection and fluorescent penetrant inspection (FPI) of the HPT thermal shield and, if cracking is detected, removal from service of the HPT thermal shield, HPT rotor stage 1 disk and HPT rotor stage 2 disk. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective August 27, 2021.

Supplementary Information: The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 by adding an AD that would apply to all General Electric Company (GE) CF6-80A, CF6-80A1, CF6-80A2, CF6-80A3, CF6-80C2A1, CF6-80C2A2, CF6-80C2A3, CF6-80C2A5, CF6-80C2A5F, CF6-80C2A8, CF6-80C2B1, CF6-80C2B1F, CF6-80C2B1F1, CF6-80C2B1F2, CF6- 80C2B2, CF6-80C2B2F, CF6-80C2B3F, CF6-80C2B4, CF6-80C2B4F, CF6-80C2B5F, CF6-80C2B6, CF6-80C2B6F, CF6-80C2B6FA, CF6-80C2B7F, CF6-80C2B8F, CF6-80C2D1F, CF6-80C2K1F, and CF6-80C2L1F model turbofan engines. The NPRM published in the Federal Register on February 22, 2021 (86 FR 10496). The NPRM was prompted by an inspection by the manufacturer that revealed cracking of the HPT rotor stage 1 disk caused by increased stress on the HPT rotor stage 1 disk as a result  of flangeto-flange cracking on the HPT thermal shield. In the NPRM, the FAA proposed to require visual inspection and FPI of the HPT thermal shield and, if cracking is detected, removal from service of the HPT thermal shield, HPT rotor stage 1 disk and HPT rotor stage 2 disk. The FAA is issuing this AD to address the unsafe condition on these products.

FMI: www.regulations.gov

Advertisement

More News

ANN's Daily Aero-Linx (05.06.25)

Aero Linx: International Federation of Airworthiness (IFA) We aim to be the most internationally respected independent authority on the subject of Airworthiness. IFA uniquely combi>[...]

ANN's Daily Aero-Term (05.06.25): Ultrahigh Frequency (UHF)

Ultrahigh Frequency (UHF) The frequency band between 300 and 3,000 MHz. The bank of radio frequencies used for military air/ground voice communications. In some instances this may >[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

Classic Aero-TV: Virtual Reality Painting--PPG Leverages Technology for Training

From 2019 (YouTube Edition): Learning To Paint Without Getting Any On Your Hands PPG's Aerospace Coatings Academy is a tool designed to teach everything one needs to know about all>[...]

Airborne 05.02.25: Joby Crewed Milestone, Diamond Club, Canadian Pilot Insurance

Also: Sustainable Aircraft Test Put Aside, More Falcon 9 Ops, Wyoming ANG Rescue, Oreo Cookie Into Orbit Joby Aviation has reason to celebrate, recently completing its first full t>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC