A-10 Continues Operations After Engineers Assess Battlefield Repair | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, May 07, 2020

A-10 Continues Operations After Engineers Assess Battlefield Repair

Telework Operations Team Managed To Get A-10 Returned To Flight

An A-10 Thunderbolt II damaged in a deployed location was quickly returned to service after a remote engineering assessment, while disbursed in response to COVID-19.

After a mission, maintenance crews needed to repair battle damage on an A-10 consisting of a bullet hole in the underbelly skin with an unknown exit point for the projectile.

Despite the challenge of teleworking, an Air Force Life Cycle Management Center team of engineers from the A-10 Division at Hill Air Force Base, Utah was formed to assess the damage.

“The team tested the teleworking capabilities during the previous weeks in anticipation of such an event,” said Pamela Lee, A-10 division chief at Hill AFB. “Because of this preparation, engineering was able to keep the lines of communication open with the unit to support the expedient response to this emergency repair.”

The entire operation was managed by email, file sharing over the global virtual private network, and telephone with none of the team members actually meeting face-to-face. Basically, the team accomplished the mission from their bedrooms, basements and home offices while flattening the virus curve by working from home.

The team lead, Ariane Aniban, directed 1st Lt. James Zhen and Reed Fawcett to develop a plan. They needed more details and directed the maintainers on the ground how to investigate further. After cutting a 3-inch hole in the underbelly, a crack in the structure with three sheared fasteners was found, along with the bullet lodged in the fuel cell cavity floor crack.

The engineer team studied the maintainer’s findings, including photos, and directed a plan of action to repair the damage. Once the steps were followed at the site, the package was assessed for airworthiness by Tim Allred and Greg Stowe, who determined the aircraft could safely return to operations.

“The disposition and flight waiver from the chief engineer were then released back to the unit in less than 24 hours,” Lee said. “I’m proud to know our team helped keep this vital aircraft in the air, performing its close-air support mission that is so important to our forces on the ground.”

Upon return to its home station, the aircraft will undergo final repairs. (ANN Salutes Daryl Mayer, Air Force Life Cycle Management Center Public Affairs for the story).

FMI: www.af.mil

Advertisement

More News

Aero-News: Quote of the Day (11.27.25)

“Achieving PMA for the S-1200 Series magnetos is another step in expanding our commitment to providing the aviation community with the most trusted and durable ‘firewal>[...]

Airborne 11.26.25: Bonanza-Baron Fini, Archer v LA NIMBYs, Gogo Loses$$$

Also: Bell 505 on SAF, NYPA Gets Flak For BizAv 'Abuse', FAA Venezuela Caution, Horizon Update Textron Aviation has confirmed it will be ending production of the Beechcraft Bonanza>[...]

FAA Seeks Info For New Brand-New ATC Platform

State-Of-The-Art Common Automation Platform To Replace Legacy Systems The FAA has issued a Request for Information (RFI) regarding the initiative of the Trump Administration and U.>[...]

USAF Reaper Drone Crashes Off the South Korean Coast

Kunsan Air Base Reported the Accident During Routine Operations The US Air Force has confirmed that it lost an MQ-9 Reaper drone to the South Korean waters on November 24. The airc>[...]

Hartzell Engine Tech Magneto Gains FAA-PMA

PowerUp S-1200 Series Approved, Available for 4- And 6-Cylinder Engines Hartzell Engine Tech announced it received FAA Parts Manufacturer Approval for its PowerUp S-1200 Series air>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC