AD: Airbus | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Labor Day Holiday

Airborne-Unlimited-09.03.24

Airborne-NextGen-09.04.24

Airborne-Unlimited-09.05.24

Airborne-Affordable Flyers-09.06.24

Sat, May 30, 2009

AD: Airbus

AD NUMBER: 2009-11-08

MANUFACTURER: Model A330-202, -223, -243, - 301, -322, and -342 Airplanes
SUBJECT: Airworthiness Directive 2009-11-08

 

SUMMARY: We are adopting a new airworthiness directive (AD) for the products listed above. This AD results from mandatory continuing airworthiness information (MCAI) originated by an aviation authority of another country to identify and correct an unsafe condition on an aviation product. The MCAI describes the unsafe condition as:

  • During the A330 and A340 aircraft fatigue test, cracks appeared on the right and left sides between the crossing area of the keel angle fitting and the front spar of the Centre Wing Box (CWB). Several modifications have been introduced in the fleet in the area of frame [FR] 40 keel angle assembly in order to prevent these cracks. However the new design has caused interference between one fastener and the keel angle which was corrected by further local reprofiling of the keel angle horizontal flange. Analysis shows that without an inspection of this reprofiled area, the structural integrity of the area is impacted, which constitutes an unsafe condition.

This AD requires actions that are intended to address the unsafe condition described in the MCAI.

FMI: http://rgl.faa.gov/Regulatory_and_Guidance_Library/rgAD.nsf/0/584D4BCC74E8DF78862575C4004F8840?OpenDocument

Advertisement

More News

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

ANN's Daily Aero-Term (09.05.24): Go Around

Go Around Instructions for a pilot to abandon his/her approach to landing. Additional instructions may follow. Unless otherwise advised by ATC, a VFR aircraft or an aircraft conduc>[...]

Klyde Morris (09.02.24)

Klyde Takes A Peak At Starliner Recovery Strategies... FMI: www.klydemorris.com>[...]

Aero-News: Quote of the Day (09.06.24)

“That’s really what makes you upset is that you are in the middle of flying an aircraft, other people on board you are responsible for and it really impacts the safety.>[...]

ANN's Daily Aero-Linx (09.06.24)

Aero Linx: KC-10 Extender The KC-10 Extender is an Air Mobility Command advanced tanker and cargo aircraft designed to provide increased global mobility for U.S. armed forces. Alth>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC