Gulfstream Announces Savannah Facility Expansion for Next-Gen Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.09.25

Airborne-NextGen-06.10.25

AirborneUnlimited-06.11.25

Airborne-AffordableFlyers-06.12.25

AirborneUnlimited-06.06.25

Fri, Oct 21, 2022

Gulfstream Announces Savannah Facility Expansion for Next-Gen Aircraft

Gulfstream Kicking Production Up a Notch to Meet Expected Demand

Gulfstream Aerospace has announced an impending expansion of its Savannah, Georgia aircraft and wing manufacturing facility to meet expected customer demand of the next-gen Gulfstream G400. 

The 262,000 square-foot expansion will add dedicated space for G400 production and wing lines, with additional room devoted to  material delivery and distribution areas. The expansion also augments ongoing growth at Gulfstream’s wing production facility adjacent to the G400, G500 and G600 manufacturing building. The headquarters currently houses production of the marque's flagship G700, new G800, and the G650ER, along with the manufacture of wings and empennages for those aircraft. Interior completion is also undertaken in Savanna, but distributed to additional Gulfstream facilities across the USA. 

“This planned expansion is part of our long-term strategic plan and investment strategy we envisioned to accommodate our next-generation family of aircraft,” said Mark Burns, president, Gulfstream. “We intentionally designed these aircraft and facilities with a range of commonalities to increase operational efficiency and flexibility. This strategy, combined with the investments we’ve made in advanced precision manufacturing, allow Gulfstream to achieve industry-leading quality and consistency.”

FMI: www.gulfstream.com

Advertisement

More News

Aero-News: Quote of the Day (06.10.25)

“The Army is investing in its future warfighters, and that means delivering training tools that truly reflect operational reality. The MD 530F is not just ready for that miss>[...]

NTSB Final Report: Arthur B Canning Merlin Lite

Contributing To The Outcome Was The Pilot’S Failure To Maintain Airspeed And His Exceedance Of The Motorglider’S Critical Angle Of Attack Analysis: The kit manufacturer>[...]

ANN's Daily Aero-Linx (06.10.25)

Aero Linx: National Warbird Operator Conference Founded in 1993, the annual NWOC event brings together warbird owners, operators, and museum directors to address particular events >[...]

ANN's Daily Aero-Term (06.11.25): Obstacle

Obstacle An existing object, object of natural growth, or terrain at a fixed geographical location or which may be expected at a fixed location within a prescribed area with refere>[...]

ANN's Daily Aero-Linx (06.11.25)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC