F-35C Completes Initial Catapult Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Nov 01, 2011

F-35C Completes Initial Catapult Testing

Aircraft Performed 'Better Than Predicted'

F-35 integrated test force personnel and F-35C test aircraft CF-3 returned to NAS Patuxent River last week after completing two major catapult test events. Starting this past summer, the test team put the carrier variant of the Joint Strike Fighter through its first set of catapult launches. The goal was to complete an initial structural survey of the aircraft to withstand launch stresses and the impact of steam ingestion into the engine.

U.S. Navy Photo

"The testing went very well," said Tom Chaillou, lead government ship suitability engineer. "The aircraft completed the structural survey, and the steam ingestion was a non-factor. The team spent a lot of time up at Lakehurst [NJ] away from home, and just did a tremendous job."

The team completed more than 50 launches to collect the needed data. The steam ingestion data produced robust results, allowing the team to reduce the number of test launches by four. "[The F-35C] did really well from the cockpit perspective," said Cmdr. Eric Buus, F-35 test pilot. "The aircraft actually flew away after launch a bit better than was predicted."

Catapult testing will continue at Lakehurst and Patuxent River to include launches at varying weights and stores, and with increased mission system functionality.

The F-35C carrier variant of the Joint Strike Fighter is distinct from the F-35A and F-35B variants with its larger wing surfaces and reinforced landing gear to withstand catapult launches and deck landing impacts associated with the demanding aircraft carrier environment. Initial carrier trials for the F-35C are scheduled for 2013. The F-35C is undergoing test and evaluation at NAS Patuxent River before delivery to the fleet.

FMI: www.navy.mil

Advertisement

More News

ANN's Daily Aero-Term (11.16.25): NonApproach Control Tower

NonApproach Control Tower Authorizes aircraft to land or takeoff at the airport controlled by the tower or to transit the Class D airspace. The primary function of a nonapproach co>[...]

Aero-News: Quote of the Day (11.16.25)

“This shutdown inflicted real damage. Beyond disrupting operations and adding risk into the aviation system… it hindered essential career growth opportunities and stal>[...]

ANN's Daily Aero-Linx (11.16.25)

Aero Linx: The Mooney Mite Site Dedicated to the Mooney M-18 Mite, "The Most Personal Airplane," and to supporting Mite owners everywhere. The Mooney M-18 Mite is a single-place, l>[...]

NTSB Final Report: Vans Aircraft Inc RV-12

Pilot’s Improper Installation Of The Control Stick Pushrod Assemblies, Which Resulted In Separation Of The Left Pushrod And A Total Loss Of Roll Control Analysis: While retur>[...]

ANN FAQ: How Do I Become A News Spy?

We're Everywhere... Thanks To You! Even with the vast resources and incredibly far-reaching scope of the Aero-News Network, every now and then a story that should be reported on sl>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC