Super Bowl Sunday Will (Hopefully) Start With A Shuttle Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Feb 06, 2010

Super Bowl Sunday Will (Hopefully) Start With A Shuttle Launch

Weather Forecast 80% "Go" In Florida, Alternate Landing Sites Look Clear

The Super Bowl isn't the only big event planned for Florida this Sunday. NASA plans to launch Space Shuttle Endeavour at 0439 EST in what will likely be the final night launch ever for the space shuttle program.

Loading of space shuttle Endeavour's fuel cells on Launch Pad 39A at NASA's Kennedy Space Center was completed early Friday morning. Cryogenics were offloaded to provide the correct ascent performance margin for the shuttle's climb to orbit.

Meanwhile, the STS-130 astronauts spent the day Friday reviewing flight plans in their crew quarters at the Operations and Checkout Building. Later, Commander George Zamka and Pilot Terry Virts took to the skies in their T-38 training jets.

The forecast has improved to an 80 percent "go" for launch and clear weather also is expected at the transoceanic abort landing sites in Spain and France.

Shuttle Endeavour and its crew will deliver to the space station a third connecting module, the Italian-built Tranquility node (Node 3) and the seven-windowed cupola, which will be used as a control room for robotics. The mission will feature three spacewalks.

Dubbed "Tranquility", Node 3 is the second connecting node module built by Thales Alenia Space and commissioned by the European Space Agency (ESA) on behalf of NASA. Its twin, Node 2 "Harmony", was provided in a similar way and was docked to the ISS in October 2007. Like its predecessor, Node 3 is a wonderful piece of technology. This 6.7-m long and 4.5-m diameter cylindrical module is fitted with six docking ports in order to provide berthing locations for future modules or vehicles. It will be mounted on the port side of Node 1 "Unity".

Node 3 will also expand the habitable volume of the ISS by 75 cubic meters and provide new locations for research hardware and living quarters. It incorporates new toilets that will improve the everyday life of the ISS permanent crew, which was expanded from three to six by mid-2009. As an improvement from Node 2, Node 3 was equipped with the most sophisticated environmental and life support system ever flown in space. In addition to water recycling and oxygen generation, it includes an atmosphere purification system that removes toxic substances and measures their components.

At launch, Node 3 will be fitted with the Cupola workstation at its end cone docking port. Once Node 3 is docked to the ISS, the Cupola will be relocated to Earth-facing port that will better suit its mission of providing a "window on outer space" in order to support docking operations outside of the Station as well as robotic activities using the various remote manipulating arms available on the orbital complex.

FMI: www.nasa.gov

Advertisement

More News

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

NTSB Prelim: Rutan Long-EZ

The Pilot Attempted Several Times To Restart The Engine And Diverted To Long Beach Airport/Daughtery Field On October 20, 2025, about 1603 Pacific daylight time, an experimental am>[...]

ANN's Daily Aero-Term (12.05.25): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (12.05.25)

"The latest development underscores the government of Malaysia’s commitment in providing closure to the families affected by this tragedy..." Source: From statements made by >[...]

Airborne-Flight Training 12.04.25: Ldg Fee Danger, Av Mental Health, PC-7 MKX

Also: IAE Acquires Diamond Trainers, Army Drones, FedEx Pilots Warning, DA62 MPP To Dresden Tech Uni The danger to the flight training industry and our future pilots is clear. Dona>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC