Repairs At Wallops Expected To Take A Year | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Mon, Dec 08, 2014

Repairs At Wallops Expected To Take A Year

Virginia Commercial Spaceflight Authority Says Pad Was Spared Major Damage

The Virginia Commercial Spaceflight Authority says that repairs to the a launch pad on Wallops Island damaged when an Orbital Antares rocket exploded on launch will take up to a year.

The assessment comes after the authority received a detailed engineering report following inspection of the damage. The failure of the booster and the subsequent explosion left a crater north of the launch pad, but water samples indicate that there was no environmental damage to back bays or tributaries, according to a report from the Associated Press.

The timeline and cost for repairs are still being finalized, but it is estimated that the budget for bringing the pad back to operational status will not exceed $20 million.

(Image from file)

FMI: www.marsspaceport.com

Advertisement

More News

ANN's Daily Aero-Term (06.30.25): Ground Stop (GS)

Ground Stop (GS) The GS is a process that requires aircraft that meet a specific criteria to remain on the ground. The criteria may be airport specific, airspace specific, or equip>[...]

ANN's Daily Aero-Linx (06.30.25)

Aero Linx: Australian Transport Safety Bureau (ATSB) The Australian Transport Safety Bureau (ATSB) improves safety and public confidence in aviation, marine and rail transport thro>[...]

Aero-News: Quote of the Day (06.30.25)

“The Palo Alto stopover confirmed—yet again—that flight schools and aero-clubs are no longer just curious about electric training; they are ready to buy. In just >[...]

NTSB Final Report: ICON A5

Pilot’s Failure To Maintain Clearance From The Water While Flying At A Low Altitude Analysis: The flight of two airplanes was in cruise flight on a north heading about 50 ft >[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC