Preparations Underway For First Landing Of X-37B | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Thu, Dec 02, 2010

Preparations Underway For First Landing Of X-37B

Exact Mission Still Not Known

Preparations for the first landing of the X-37B are underway at Vandenberg Air Force Base.


Air Force Photo

According to an Air Force news release, space professionals from the 30th Space Wing will monitor the de-orbit and landing of the Air Force's first X-37B, called the Orbital Test Vehicle 1 (OTV-1). While the exact landing date and time will depend on technical and weather considerations, it is expected to occur between Friday, December 3, and Monday, December 6, 2010.

The flight of the OTV-1 has been shrouded in secrecy. A worldwide network of amateur sky-watchers had tried to keep tabs on the mini-shuttle wince its launch in April. The spacecraft shifted its orbit twice during the flight, causing a lot of speculation about the purpose of the mission. "The X-37B has the potential to bring to space the flexibility that unmanned systems provide warfighters and combatant commanders today," said Dennis Muilenburg, president and CEO of Boeing Defense, Space & Security, at the time of the launch. Boeing built the X-37B.


Air Force Photo

The Air Force said the vehicle would be used to demonstrate a reliable, reusable unmanned space test platform. Program objectives were listed as space experimentation, risk reduction, and concept-of-operations development for reusable space vehicle technologies.

Pentagon sources have indicated that there is a second X-37B in the works.

FMI: www.afspc.af.mil

Advertisement

More News

NTSB Final Report: Cessna 177B

Outboard Section Of The Right Wing And The Right Flap Separated In Flight And The Airplane Impacted A Farm Field Analysis: The pilot was approaching his destination airport under i>[...]

ANN's Daily Aero-Term (05.08.25): Final Approach Fix

Final Approach Fix The fix from which the final approach (IFR) to an airport is executed and which identifies the beginning of the final approach segment. It is designated on Gover>[...]

Aero-News: Quote of the Day (05.08.25)

"Our choice of when to respond, how to respond and on which targets to respond is a consideration that we make every time... Netanyahu also noted that anyone attacking Israel &ldqu>[...]

ANN's Daily Aero-Term (05.09.25): Estimated (EST)

Estimated (EST) When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the e>[...]

ANN's Daily Aero-Linx (05.09.25)

Aero Linx: Coalition of Airline Pilots Associations (CAPA) The Coalition of Airline Pilots Associations (CAPA) is the world’s largest pilot trade association representing ove>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC