AeroSports Update: The UK CAA Simplifies Initial Testing Of Small Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Wed, Nov 25, 2015

AeroSports Update: The UK CAA Simplifies Initial Testing Of Small Aircraft

Flight Testing Of Prototype Small Aircraft In The UK Is Now Less Expensive And Complex

When a manufacturer goes to develop a new aircraft, it’s not as simple as just building a prototype and seeing how it works. Up until now, both the U.S. and the UK have required a prototype aircraft to be certified for the purpose of flight testing prior to the first flight. This can be a complex and expensive process. But now, things have changed in the UK.

In the UK, the requirements for experimental aircraft, known as E conditions, will benefit small-scale aircraft designers and manufacturers by reducing the red tape and financial burdens associated with securing airworthiness and operational approval for new light aircraft designs, encouraging the growth of new design concepts.

The requirements allow aircraft designers to try out a new concept aircraft (up to a maximum take-off mass of 2,000 kg, which is about 4,400 pounds) in the air without going through the costly and time consuming procedures that currently exist to get a new design past the initial stage of proof-of-concept prototype. E Conditions can also be used to test aircraft modifications or if the aircraft is being operated in a manner or role that is previously unproven. If, after trying out a promising idea, it is thought to be viable, then a full certification program can be planned and funded in the usual way.

Individuals and organizations conducting proof-of-concept flights will still be required to undertake a risk assessment to support the activity and in particular, ensure that the risks to third parties are adequately addressed. For example, flights would not be allowed over congested areas, the pilot must be suitably qualified and no passengers or cargo can be carried. Prior to the commencement of flight, an E Conditions Declaration must be submitted to the CAA relating to the flight test program.

These flight testing changes have been put in place in an effort to encourage more light aircraft development.

FMI: www.caa.co.uk

Advertisement

More News

Classic Aero-TV: Up Close And Personal - The Aeroshell Aerobatic Team at Oshkosh

From 2014 (YouTube Version): One Of The Airshow World's Pre-Eminent Formation Teams Chats About The State Of The Industry At EAA AirVenture 2014, ANN News Editor Tom Patton gets th>[...]

ANN's Daily Aero-Term (07.13.25): Tactical Air Navigation (TACAN)

Tactical Air Navigation (TACAN) An ultra-high frequency electronic rho-theta air navigation aid which provides suitably equipped aircraft a continuous indication of bearing and dis>[...]

ANN's Daily Aero-Linx (07.13.25)

Aero Linx: Doobert Hi, we're Chris & Rachael Roy, founders and owners of Doobert. Chris is a technology guy in his “day” job and used his experience to create Doobe>[...]

NTSB Prelim: Pitts S2

The Airplane Was Spinning In A Nose-Down Attitude Before It Impacted Terrain On June 20, 2025, at 0900 eastern daylight time, a Pitts Aerobatics S-2B, N79AV, was destroyed when it >[...]

Airborne 07.09.25: B-17 Sentimental Journey, Airport Scandal, NORAD Intercepts

Also: United Elite Sues, Newark ATC Transitions, Discovery Moves?, Textron @ KOSH The Commemorative Air Force Airbase Arizona is taking its “Flying Legends of Victory Tour&rd>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC