Teams Continue To Work Toward Nov. 30 Discovery Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Mon, Nov 15, 2010

Teams Continue To Work Toward Nov. 30 Discovery Launch

GUPC Alignment Tweaked, Fuel Tank Foam Repairs Proceeding

Space Shuttle Discovery continues to wait at launch complex 39A at the Kennedy Space Center in Cape Canaveral, FL, as technicians work to prepare her for her final mission into space.


NASA File Photo

Over the weekend, additional measurements were taken to ensure the best possible alignment of the newly installed ground umbilical carrier plate, or GUCP, on space shuttle Discovery's external fuel tank. Teams installed the flight seal Friday night and will meet today to evaluate data. Technicians expect to begin installing the quick disconnects today (Monday).

Engineers also are continuing work to repair cracks in Discovery's external tank intertank section. During foam removal and inspection of adjacent stringers to the one with two 9-inch cracks, technicians identified a crack about 3-inches long on the left-hand adjacent stringer. This was not an unexpected result since the load was most likely transferred to the adjacent stringer when both sides of the original stringer cracked during tanking operations for Discovery's scrubbed launch attempt on Nov. 5. Teams will build and use existing structural math models to understand the loading at the interface. Stringers are aluminum support strips on the outside of the external tank that form the section between the inside liquid oxygen tank and the liquid hydrogen tanks.

Discovery's launch was delayed when the leaking GUPC was discovered. The cracks in the foam insulation on the main fuel tank were found during the GUPC inspection. The shuttle is now targeted for launch on a mission to ISS on November 30. It will be Discovery's final space flight.

FMI: www.nasa.gov

Advertisement

More News

Classic Aero-TV: Up Close And Personal - The Aeroshell Aerobatic Team at Oshkosh

From 2014 (YouTube Version): One Of The Airshow World's Pre-Eminent Formation Teams Chats About The State Of The Industry At EAA AirVenture 2014, ANN News Editor Tom Patton gets th>[...]

ANN's Daily Aero-Term (07.13.25): Tactical Air Navigation (TACAN)

Tactical Air Navigation (TACAN) An ultra-high frequency electronic rho-theta air navigation aid which provides suitably equipped aircraft a continuous indication of bearing and dis>[...]

ANN's Daily Aero-Linx (07.13.25)

Aero Linx: Doobert Hi, we're Chris & Rachael Roy, founders and owners of Doobert. Chris is a technology guy in his “day” job and used his experience to create Doobe>[...]

NTSB Prelim: Pitts S2

The Airplane Was Spinning In A Nose-Down Attitude Before It Impacted Terrain On June 20, 2025, at 0900 eastern daylight time, a Pitts Aerobatics S-2B, N79AV, was destroyed when it >[...]

Airborne 07.09.25: B-17 Sentimental Journey, Airport Scandal, NORAD Intercepts

Also: United Elite Sues, Newark ATC Transitions, Discovery Moves?, Textron @ KOSH The Commemorative Air Force Airbase Arizona is taking its “Flying Legends of Victory Tour&rd>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC