GAO Report: FAA Needs IT Management, Oversight Improvement | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Sat, Sep 25, 2004

GAO Report: FAA Needs IT Management, Oversight Improvement

Agency performed well in planning, requirements management and technical analysis

The GAO has issued a pair of reports that point to problems with IT management and oversight at the Federal Aviation Administration. specifically, the report states that the FAA needs to improveme its software acquisition processes and work to eliminate a series of weak points that will lead to cost overruns, delays and other shortfalls.

The reports, according to Government Computer News, state that the FAA is doing well in the areas of project planning, requirements management and the identification of approaches to resolve technical issues related to the acquisition of IT technology.

However, it also found shortcomings in the agency's verification, QA and performance measurement, as well as in needs analysis. GAO also applauded the agency's adoption of the Integrated Capability Maturity Model to analyze software development skill maturity, but noted that project managers are being given the option to use or ignore the Model in their projects.

“The projects that have adopted the model have demonstrated growth in the maturity of their processes, and more and more projects have adopted the model,” GAO said.  “The recurring weaknesses we identified in our project-specific evaluations are due in part to the choices these projects were given in deciding whether and how to adopt this process improvement initiative."

The report recommends that the FAA implements the model, or an equivalent, in the entire Air Traffic Organization, and should standardize its measurement and oversight processes throughout the agency.

FAA officials expressed general agreement with the audit findings and have begin implementing the recommendations.

FMI: www.gao.gov/new.items/d04901.pdf, www.gao.gov/new.items/d04822.pdf

Advertisement

More News

Aero-News: Quote of the Day (07.11.25)

“Honored to accept this mission. Time to take over space. Let’s launch.” Source: SecTrans Sean Duffy commenting after President Donald Trump appointed U.S. Secret>[...]

ANN's Daily Aero-Term (07.11.25): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth's surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clutter&rd>[...]

ANN's Daily Aero-Linx (07.11.25)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

NTSB Final Report: Schweizer SGS 2-33A

Glider Encountered A Loss Of Lift And There Was Not Sufficient Altitude To Reach The Airport Analysis: The flight instructor reported that while turning final, the glider encounter>[...]

NTSB Prelim: Aeronca 7AC

Airplane Climbed To 100 Ft Above Ground Level, At Which Time The Airplane Experienced A Total Loss Of Engine Power On May 24, 2025, at 1300 eastern daylight time, an Aeronca 7AC, N>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC