Censys Boasts 100% BVLOS Approval Rate | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Jan 15, 2022

Censys Boasts 100% BVLOS Approval Rate

UAV Survey and Mapping Company Obtains 3.3-Mile Approval on DoD Project

Censys Technologies obtained Beyond Visual Line of Sight approval for Architecture, Engineering, Constructions, Operations, and Management (AECOM), maintaining the company's 100% BVLOS waiver approval rate.

The infrastructure consulting firm aids designers, engineers, environmentalists, and construction specialists in their efforts to map and survey projects in the making. Their record of approval is vital to keeping  timeframes and schedules as planned, important considerations in construction when projects involve a litany of moving parts to maintain an efficient building pace. 

The Censys AECOM team plans to use their newest waiver for a wide area mapping project for a Department of Defense project over a nearly 20 square mile plot of terrain. The waiver's approval allows the remote pilot-in-command to fly within a 3.3 mile radius during the job, which the company says will enhance the  per-flight ROI by 700%. Without BVLOS permission, the pilot would be required to stay within 1.25 miles of the drone at all times, requiring a greater frequency of repositioning, travel, and unneeded stops. 

"With each approval, our waiver team becomes more confident about writing complex waivers," said Matt Nanney, remote sensing manager in AECOM. "In terms of waivers, 2021 is the tip of the iceberg for us." Censys CTO and waiver specialist John Lobdell said the waiver required highly specific expertise in drafting the request. "This approved waiver pushes the boundaries," said Lobdell. "It gives the RPIC more mission capability in a large area compared to other waivers we have gotten approved." 

FMI: www.censystech.com

Advertisement

More News

Classic Aero-TV: Pure Aerial Precision - The Snowbirds at AirVenture 2016

From 2016 (YouTube Edition): The Canadian Forces Snowbirds Can Best Be Described As ‘Elegant’… EAA AirVenture 2016 was a great show and, in no small part, it was>[...]

NTSB Final Report: Costruzioni Aeronautiche Tecna P2012 Traveller

Airplane Lunged Forward When It Was Stuck From Behind By A Tug That Was Towing An Unoccupied Airliner Analysis: At the conclusion of the air taxi flight, the flight crew were taxii>[...]

ANN's Daily Aero-Linx (11.23.25)

Aero Linx: International Stinson Club So you want to buy a Stinson. Well the Stinson is a GREAT value aircraft. The goal of the International Stinson Club is to preserve informatio>[...]

ANN's Daily Aero-Term (11.23.25): Request Full Route Clearance

Request Full Route Clearance Used by pilots to request that the entire route of flight be read verbatim in an ATC clearance. Such request should be made to preclude receiving an AT>[...]

Aero-News: Quote of the Day (11.23.25)

"Today's battlefield is adapting rapidly. By teaching our soldiers to understand how drones work and are built, we are giving them the skills to think creatively and apply emerging>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC