And Then There Were Three ... Dreamliners Flying | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Feb 26, 2010

And Then There Were Three ... Dreamliners Flying

Boeing's ZA004 Joins 787 Flight-Test Program

A third airplane has joined the Boeing 787 Dreamliner flight-test program. ZA004, the fourth flight-test airplane to be built, took off at 1143 PST local time Wednesday from Paine Field in Everett, WA. The program plan called for ZA004 to fly before ZA003 because the data ZA004 is collecting is needed more quickly both for certification and development of the 787-9.

Captains Heather Ross and Craig Bomben completed a three-hour-and-two-minute flight at 2:45 p.m., landing at Boeing Field in Seattle. Flight-test personnel were also on board to monitor airplane performance. "Airplane No. 4 operated flawlessly today," Ross said after landing. "We've got a lot of work ahead of us but I can't imagine a better start to the flight test program for this airplane."

Ross will serve as chief pilot for ZA004. This airplane will be used to accomplish the following types of tests: aerodynamics, high-speed performance, propulsion performance, flight loads, community noise and extended operations (ETOPS) and other test conditions.

During Wednesday's flight, the airplane reached an altitude of 30,000 feet and an airspeed of 255 knots. As the testing of the 787 fleet progresses, the airplane will fly at its expected in-service maximum altitude of 40,000 feet and speed of Mach 0.85.

"We are continuing to make good progress on the flight test program," said Scott Fancher, vice president and general manager of the 787 program, Boeing Commercial Airplanes. "The team is staying focused and disciplined in keeping the priority on safety and execution of the plan."

FMI: www.boeing.com

Advertisement

More News

Airborne 11.24.25: ANN's 30th!, Starship’s V3 Booster Boom, Earhart Records

Also: 1st-Ever Space Crime Was a Fraud, IAE Buys Diamonds, Kennon Bows Out, Perseverance Rover An interesting moment came about this past Sunday as ANN CEO, Jim Campbell, noted tha>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Classic Aero-TV: DeltaHawk Aero Engine Defies Convention

From 2023 (YouTube Edition): Deviation from the Historical Mean Racine, Wisconsin-based DeltaHawk is a privately-held manufacturer of reciprocating engines for aircraft and hybrid >[...]

NTSB Final Report: Glasair GlaStar

Smoke Began Entering The Cockpit During The Landing Flare, And Then The Pilot Noticed Flames On The Right Side Of The Airplane Analysis: The pilot reported that about 30 minutes in>[...]

ANN's Daily Aero-Term (11.22.25): Remote Communications Outlet (RCO)

Remote Communications Outlet (RCO) An unmanned communications facility remotely controlled by air traffic personnel. RCOs serve FSSs. Remote Transmitter/Receivers (RTR) serve termi>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC