AD: Airbus SAS Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Tue, Feb 18, 2020

AD: Airbus SAS Airplanes

AD NUMBER: 2020-02-20

PRODUCT: Certain Airbus SAS Model A318 series airplanes; Model A319-111, -112, -113, -114, -115, -131, - 132, and -133 airplanes; A320-211, -212, -214, -231, -232, and -233 airplanes; and Model A321-111, -112, -131, -211, -212, -213, -231, and -232 airplanes.

ACTION: Final rule

SUMMARY: The FAA is superseding Airworthiness Directive (AD) 2014-24-07, which applied to certain Airbus SAS Model A318 series airplanes; Model A319-111, -112, -113, -114, -115, -131, - 132, and -133 airplanes; A320-211, -212, -214, -231, -232, and -233 airplanes; and Model A321-111, -112, -131, -211, -212, -213, -231, and -232 airplanes.

AD 2014-24-07 required repetitive rototest inspections for cracking; corrective actions if necessary; and modification of the torsion box, which terminates the repetitive inspections.

This AD continues to require the actions in AD 2014-24-07, with certain revised compliance times, as specified in a European Union Aviation Safety Agency (EASA) AD, which is incorporated by reference.

This AD was prompted by a report of a crack found in the side box beam flange of the fuselage at the frame (FR) 43 level during a fatigue test campaign.

DATES: This AD is effective March 20, 2020.

COST: The FAA estimates that this AD affects 851 airplanes of U.S. registry. Operators may incur the following costs in order to comply with this AD:

Retained actions from AD 2014-24-07

  • Labor: 178 work-hours × $85 per hour = $15,130
  • Parts: $31,334
  • Cost per airplane: $46,464

The new requirements of this AD add no new economic burden. The FAA has received no definitive data that would enable the agency to provide cost estimates for the on-condition actions specified in this AD.

FMI: AD

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC