GAO's Study on Tanker Aircraft Released | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Wed, Jun 25, 2003

GAO's Study on Tanker Aircraft Released

Report Will Give Naysayers More Ammo

Do you remember how Boeing inexplicably kept dropping the price on its767-based tankers? Do you remember how a lot of folks thought the Boeing-Air Force tanker deal sounded really sweet? Well, the General Accounting Office has issued a report called, "Information on Air Force Aerial Refueling Tankers." It's an interesting read. In case you don't have time to read the whole thing, here's the overview:

The Air Force fleet of KC-135 aircraft (which, at 543 aircraft, represents the bulk of U.S. refueling capability) is an average of about 42 years in age. The Air Force projects that the KC-135 aircraft have between 36,000 and 39,000 lifetime flying hours; according to the Air Force, only a few KC-135s are projected to reach these limits before 2040, although at that time some of the aircraft would be close to 80 years old. KC-135s are being flown an average of about 435 hours per year, on average, since September 2001. As the fleet has aged, the aircraft have become expensive to maintain, averaging about $4.6 million per year in total operations and support costs for the least capable aircraft. Those costs include personnel, fuel, maintenance, and spare parts.

[A more-useful comparison would have included the marginal differences in personnel, fuel, maintenance, and spares, between the two programs, over the projected life of the existing aircraft, including the expected retirements of KC135-E models (and also including weighted figures on the fleet's KC-10s -- above and right -- and KC-135-R models) --ed.]

KC-135s in the active duty forces are generally meeting the 85 percent goal for mission capable rates; rates were lower for aircraft in the reserve forces, ranging from 70 to 78 percent. The Air Force Reserve and Air National Guard operate over half of the KC-135s.

[All the active forces KC-135s are -R models, which the report says average $3.7 million/year. Higher fuel consumption, lighter effective payload, as well as higher maintenance and parts costs presumably raise the Guard-only KC-135E's costs --ed.]

What the new report says, politely, is that the current fleet should last decades longer, and that the USAF doesn't have any reliable information that says otherwise: "DOD does not have a current, validated study on which to base the size and composition of either the current fleet or a future aerial refueling force. An Air Force study called Tanker Requirements Study-05 (TRS-05) was conducted in 2000, but it was never formally completed nor were its preliminary results released. Drafts of the study identified a shortfall in tanker capability, but the study was based on the old strategy of supporting two major theater wars. There is no effort under way that we know of to update the TRS-05 study and release it or to conduct an analysis of alternatives for tanker modernization." Elsewhere, the report noted, "The Air Force indicated recently that it plans to conduct a new Tanker Requirements Study in the fiscal year 2004-2006 time frame."

FMI: www.gao.gov/new.items/d03938t.pdf

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC