NASA Selects Contractor To Prepare Launch Structure For Mars Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Mon, Aug 17, 2015

NASA Selects Contractor To Prepare Launch Structure For Mars Launch

Fixed-Price Contract Worth $45.8 Million For Construction Company

NASA has selected J. P. Donovan Construction, Inc., of Rockledge, Florida to begin work at the agency’s Kennedy Space Center in Florida on the ground structures that will launch NASA’s next generation rocket and spacecraft on the journey to Mars and other deep space destinations.

The Ground Systems Development and Operations (GSDO) Mobile Launcher Ground Support Equipment Installation contract is a firm, fixed-price contract that extends for 455 calendar days and has a maximum value of $45.8 million. Significant subcontractors are Core Electric of Melbourne, Florida; MDI Services, LLC of Orlando, Florida; and Bragg Crane & Rigging of Long Beach, California.

J.P. Donovan Construction will install and integrate ground support equipment onto the existing Mobile Launcher to modify the structure with systems necessary to assemble, process and launch NASA’s integrated Space Launch System rocket and Orion spacecraft.

GSDO’s primary objective is to prepare Kennedy to process and launch the next generation vehicles and spacecraft designed to achieve NASA's goals for space exploration. To achieve this transformation, program personnel are developing the necessary ground systems while refurbishing and upgrading infrastructure and facilities to meet tomorrow's demands. This modernization effort keeps flexibility in mind, in order to accommodate a multitude of government, commercial and other customers.

(Image from file)

FMI: www.nasa.gov/groundsystems

Advertisement

More News

Airborne 07.02.25: TikToker Arrested, Vietnam A/L Ground Hit, ATC Modernization

Also: Outlaw Prop 4 Mooney, Ready 4 Duty, Ukrainian F-16 Pilot Lost, Blue Origin Flt On his journey to become the first pilot to land solo on all seven continents, 19-year-old Etha>[...]

Airborne Affordable Flyers 07.03.25: Sonex HW, BlackShape Gabriel, PRA Fly-In 25

Also: DarkAero Update, Electric Aircraft Symposium, Updated Instructor Guide, OSH Homebuilts Celebrate The long-awaited Sonex High Wing prototype has flown... the Sonex gang tells >[...]

ANN's Daily Aero-Term (07.07.25): Discrete Code

Discrete Code As used in the Air Traffic Control Radar Beacon System (ATCRBS), any one of the 4096 selectable Mode 3/A aircraft transponder codes except those ending in zero zero; >[...]

Classic Aero-TV: DeltaHawk Aero Engine Defies Convention

From 2023 (YouTube Edition): Deviation from the Historical Mean Racine, Wisconsin-based DeltaHawk is a privately-held manufacturer of reciprocating engines for aircraft and hybrid >[...]

ANN's Daily Aero-Linx (07.07.25)

Aero Linx: Formation and Safety Team (F.A.S.T.), USA The Formation and Safety Team (FAST) is a worldwide, educational organization dedicated to teaching safe formation flying in Wa>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC