Conway Crash Result of Missing Gasket | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.24.25

AirborneNextGen-
11.18.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Dec 04, 2023

Conway Crash Result of Missing Gasket

Inattentive Maintenance Kills Again

A Piper PA-28R-201 crashed in Conway, South Carolina on September 14, 2022, causing fatal injuries to 2.

"Shortly after departure, on the first flight following maintenance, the pilot reported a loss of engine power," reads the NTSB report. "The pilot attempted a forced landing onto a gravel road, but the airplane impacted trees and powerlines on final approach. The airplane came to rest against a berm and a post crash fire ensued."

During their investigation, the NTSB found a good deal of engine damage, oil, and heat discoloration. Following the clues, they believe that the aircraft was returned to service while missing a vital part, despite two pairs of eyes supposedly assuring the work. An A&P had completed work on the Piper Arrow III, and it was signed off on by a director with Inspection Authorization.

"A review of the airplane maintenance records revealed that after a certificated airframe and powerplant mechanic had completed the work on the airplane, the Director of Maintenance, an airframe and powerplant mechanic with inspection authorization, signed off the paperwork to return the airplane back to service. The return to service entry stated that the vacuum pump had been removed but did not address the installation of the drive pad gasket or vacuum pump cover."

The report serves a sobering reminder to double check your work, if nothing else. "In an interview, the mechanic who completed the removal of the vacuum pump and installation of the vacuum pump cover stated that when he removed the vacuum pump, the gasket was still attached to it. He cleaned the mating surface of the cover and drive pad and then installed the cover. He stated that he thought he had replaced the gasket. A review of the work order showed that although the cover had been ordered, there was no record of a gasket being ordered."

FMI: www.ntsb.gov

Advertisement

More News

Aero-News: Quote of the Day (11.27.25)

“Achieving PMA for the S-1200 Series magnetos is another step in expanding our commitment to providing the aviation community with the most trusted and durable ‘firewal>[...]

Airborne 11.26.25: Bonanza-Baron Fini, Archer v LA NIMBYs, Gogo Loses$$$

Also: Bell 505 on SAF, NYPA Gets Flak For BizAv 'Abuse', FAA Venezuela Caution, Horizon Update Textron Aviation has confirmed it will be ending production of the Beechcraft Bonanza>[...]

FAA Seeks Info For New Brand-New ATC Platform

State-Of-The-Art Common Automation Platform To Replace Legacy Systems The FAA has issued a Request for Information (RFI) regarding the initiative of the Trump Administration and U.>[...]

USAF Reaper Drone Crashes Off the South Korean Coast

Kunsan Air Base Reported the Accident During Routine Operations The US Air Force has confirmed that it lost an MQ-9 Reaper drone to the South Korean waters on November 24. The airc>[...]

Hartzell Engine Tech Magneto Gains FAA-PMA

PowerUp S-1200 Series Approved, Available for 4- And 6-Cylinder Engines Hartzell Engine Tech announced it received FAA Parts Manufacturer Approval for its PowerUp S-1200 Series air>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC