Final Assembly Underway On First GE9X Engine | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Feb 11, 2016

Final Assembly Underway On First GE9X Engine

Will Enter Service In Four Years Aboard Boeing's 777X

Final assembly is well underway on the first full GE9X engine that will test in the first half of 2016, four years before the GE9X engine enters service on a Boeing 777X aircraft.

“Assembly of the first full GE9X engine is on track and coming together very nicely,” said Bill Millhaem, general manager of the GE90/GE9X engine programs at GE Aviation. “The GE9X team is extremely excited to see the engine design come to life and looks forward to watching it run soon on a test stand in Peebles, Ohio.“

The first engine to test (FETT) wraps up the extensive technology maturation program for the GE9X engine program, which began almost five years ago and has included component-level, system-level and core demo testing to validate the advanced technologies and materials in the new engine. FETT brings all the technologies together to demonstrate their operability as a complete propulsion system as well as provide early information on the engine’s aerodynamic and thermal characteristics.

Compared to prior engine development programs, the GE9X FETT is scheduled earlier in the development process, just a mere six months after the engine design was finalized. The second GE9X engine is scheduled to test in 2017 along with flight testing on GE Aviation’s flying test bed. This timing assures all learnings from FETT will be captured in all certification engines. Engine certification is anticipated in 2018.

With almost 700 GE9X engines on order, the GE9X engine will be in the 100,000 pound thrust class and will be the largest engine ever produced with a 134-inch diameter composite fan case and 16 fourth generation carbon fiber composite fan blades. Other key features include; a next-generation 27:1 pressure-ratio 11-stage high-pressure compressor; a third-generation TAPS III combustor for high efficiency and low emissions; and CMC material in the combustor and turbine.

IHI Corporation, Snecma and Techspace Aero (Safran), and MTU Aero Engines AG are participants in the GE9X engine program.

(Source: GE Aviation news release)

FMI: www.geaviation.com

Advertisement

More News

Aero-News: Quote of the Day (12.09.25)

“We respectfully call on the City of Mesa to: 1. Withdraw the landing fee proposal immediately 2. Engage with the aviation community before making decisions that impact safet>[...]

ANN's Daily Aero-Term (12.09.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

ANN's Daily Aero-Linx (12.09.25)

Aero Linx: International Federation of Airworthiness (IFA) IFA uniquely combines together all those with responsibility for policies, principles and practices concerned with the co>[...]

NTSB Final Report: Diamond Aircraft Ind Inc DA20C1 (A1); Robinson Helicopter R44

Controller’s Expectation That VW02 Would Have Departed Sooner Led To An Inadequate Scan And Loss Of Situational Awareness Analysis: A Robinson R-44 helicopter N744AF, VW02 (V>[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC