Boeing Introduces New Method For Building 777 Fuselages | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Mon, Jul 21, 2014

Boeing Introduces New Method For Building 777 Fuselages

Fuselage Automated Upright Build Expected To Yield Safety, Quality Benefits

Boeing is in the final phases of testing and production readiness of a new method for building 777 fuselages as part of its ongoing technology investment strategy, the company says.

Known as the Fuselage Automated Upright Build, or FAUB, this Advanced Manufacturing technology improves workplace safety and increases product quality. This technology has been in development by Boeing since 2012.

With this new technology, fuselage sections will be built using automated, guided robots that will fasten the panels of the fuselage together, drilling and filling the more than approximately 60,000 fasteners that are today installed by hand.

FAUB offers numerous benefits including an improvement in employee safety. The nature of the drilling and filling work makes it ideal for an automated solution. More than half of all injuries on the 777 program have occurred during the phase of production that is being automated. In addition, the automated system is expected to reduce build times and improve first-time quality of the build process.

"This is the first time such technology will be used by Boeing to manufacture widebody commercial airplanes and the 777 program is leading the way," said Elizabeth Lund, vice president and general manager, 777 program and Everett site, Boeing Commercial Airplanes. "We're excited to continue improving the production process here and we're positioning ourselves to begin building 777X airplanes in the future."

The 777 program has already begun testing FAUB at a facility in Anacortes, WA Production readiness preparations are underway and the system will be installed in Everett in a new portion of the main factory that is under construction now. The technology is expected to be implemented in the next few years.

The robotic system, designed for Boeing by KUKA Systems, is the latest in a series of strategic Advanced Manufacturing moves on the 777 program, which have already included new systems for painting wings and other drilling operations.

(Image provided by Boeing)

FMI: www.boeing.com

Advertisement

More News

NTSB Final Report: Rutan Long-EZ

He Attempted To Restart The Engine Three Times. On The Third Restart Attempt, He Noticed That Flames Were Coming Out From The Right Wing Near The Fuel Cap Analysis: The pilot repor>[...]

ANN FAQ: Turn On Post Notifications

Make Sure You NEVER Miss A New Story From Aero-News Network Do you ever feel like you never see posts from a certain person or page on Facebook or Instagram? Here’s how you c>[...]

Classic Aero-TV: ICAS Perspectives - Advice for New Air Show Performers

From 2009 (YouTube Edition): Leading Air Show Performers Give Their Best Advice for Newcomers On December 6th through December 9th, the Paris Las Vegas Hotel hosted over 1,500 air >[...]

ANN's Daily Aero-Linx (06.28.25)

Aero Linx: NASA ASRS ASRS captures confidential reports, analyzes the resulting aviation safety data, and disseminates vital information to the aviation community. The ASRS is an i>[...]

Aero-News: Quote of the Day (06.28.25)

“For our inaugural Pylon Racing Seminar in Roswell, we were thrilled to certify 60 pilots across our six closed-course pylon race classes. Not only did this year’s PRS >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC