White House Aero-Hit-List #9: Transformational Satellite | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Fri, May 08, 2009

White House Aero-Hit-List #9: Transformational Satellite

$17 Billion Cut... But Trillions More Spent Elsewhere

The Obama Administration, in the process of spending trillions of dollars for all manner of programs and projects, is trumpeted the 17 Billion dollars it is trying to cut from the Federal Budget. Rather than try to digest them all en masse, we'll look at each of them one at a time and allow you to make up YOUR mind as to the rationale and wisdom for the decisions included below. Herewith; another of the programs on the chopping block that has an aviation or aerospace connotation.

From the 'Terminations, Reductions, and Savings' document published this week by the OMB, as part of the FY 2010 US Budget:

Proposal: The Administration proposes to terminate the Air Force's Transformational Satellite (TSAT) program because of significant cost increases and slips in schedule. It intends instead to buy additional Advanced Extremely High Frequency (AEHF) satellites, which offer maturity and stability in technology development and in design. The TSAT program was envisioned as a constellation of four satellites and a spare -- with supporting ground infrastructure -- designed to provide strategic communications and Internet-like capabilities to deployed forces.

Justification: The TSAT program has suffered from funding instability, and increasing costs and development delays. Moreover, the program's schedule has slipped significantly. The Government Accountability Office (GAO) noted that the revised date for the launch of the first satellite was 2019 -- almost four years later than previously scheduled.1 GAO further noted that the launch delay was supported by the Office of the Joint Chiefs of Staff, which had concerns about TSAT's development progress and synchronization with other programs. Also, in recent testimony before the Congress regarding alternate budget scenarios, the Congressional Budget Office pointed to the cancellation of TSAT as a potential cost-saving measure.

Based on a recent revision of the program, the estimated investment cost for the current TSAT program is $19.4 billion. This represents an increase in the cost for each satellite of roughly $400 million over the original estimate. Significantly, the latest TSAT configuration has substantially less technical capability than what was proposed for the original configuration. The Air Force has spent approximately $3.3 billion on the TSAT program through 2009. A preliminary assessment done by the Department of Defense (DOD) anticipates savings of about $1.5 to $2.5 billion dollars though 2015 as a result of procuring AEHF satellites in the place of TSATs.

Procuring more than the four AEHF satellites currently under development will allow DOD to continue upgrading its communications satellite inventory with less expensive satellites than TSAT. AEHF satellites will provide a significantly higher data throughput capacity than protected satellites currently in use. Also, they have enhanced features to make them more survivable, jam-resistant, and secure from eavesdropping than current protected satellites. Most importantly -- and as noted by GAO -- AEHF component technologies are mature and their design appears stable.

FMI: www.whitehouse.gov/omb/budget/fy2010/assets/trs.pdf

Advertisement

More News

Airborne 05.19.25: Kolb v Tornados, Philippine Mars, Blackhawk Antler Theft

Also: Tentative AirVenture Airshow Lineup, Supersonic Flight Regs, Private Pilot Oral Exam Guide, Boeing Deal The sport aircraft business can be a tough one... especially when Moth>[...]

Airborne 05.23.25: Global 8000, Qatar B747 Accepted, Aviation Merit Badge

Also: Virtual FLRAA Prototype, IFR-Capable Autonomous A/C, NS-32 Crew, Golden Dome Missile Defense Bombardier announced that the first production Global 8000 successfully completed>[...]

ANN's Daily Aero-Term (05.23.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

Aero-News: Quote of the Day (05.23.25)

“While we are relieved that no one was injured, the destruction of our aircraft will have severe consequences on our operations, and it is a personal blow to our dedicated te>[...]

ANN's Daily Aero-Linx (05.23.25)

Aero Linx: Ercoupe Owners Club We fly an airplane that was the peak of pre-World War II development. It took more than a decade and a half before the features of the Ercoupe were t>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC