Pad 39A Conversion Underway | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Mon, Nov 24, 2014

Pad 39A Conversion Underway

SpaceX Modifying The Historic Site For Its Falcon Heavy Rocket

Modifications of launch Pad 39A at the Kennedy Space Center are underway, as SpaceX prepares for the first launch of a Falcon Heavy rocket from the historic facility.

The pad was mothballed by NASA and the Kennedy Space Center after the shuttle program ended in 2011. It was one of the last visible reminders of that era of space travel.

With all SLS launches planned for pad 39B, NASA awarded the right to repurpose 39A to SpaceX, and the private company hopes to be able to launch the first of its new heavy rockets next summer.

NASASpaceflight.com reports that most of the work currently underway seems to be on the perimeter of the launch site, and a SpaceX says that the pad will retain much of its current appearance. For Instance, according to SpaceX spokesman John Taylor, the Rotating Service Structure (RSS) that had been an integral part of the payload installation process for the Shuttle will remain in place. There had been speculation that SpaceX would also add to the Fixed Service Structure (FSS) at the pad, but Taylor said that for now, it will remain at its current height, but with some structural reinforcements.

A date of July 1, 2015 has been set for a "Wet Dress Rehearsal" (WDR) for the Falcon Heavy to validate the rocket and launch systems. The next steps would be a Static Fire test and a Launch Readiness Review before the actual first flight test is conducted.

(NASA image of Discovery at Pad 39A)

FMI: www.spacex.com

Advertisement

More News

Oshkosh Memories: An Aero-News Stringer Perspective

From 2021: The Inside Skinny On What Being An ANN Oshkosh Stringer Is All About By ANN Senior Stringer Extraordinare, Gene Yarbrough The annual gathering at Oshkosh is a right of p>[...]

NTSB Prelim: Piper PA32RT

Video Showed That During The Takeoff, The Nose Baggage Door Was Open On May 10, 2025, about 0935 eastern daylight time, a Piper PA-32RT-300, N30689, was destroyed when it was invol>[...]

ANN FAQ: Follow Us On Instagram!

Get The Latest in Aviation News NOW on Instagram Are you on Instagram yet? It's been around for a few years, quietly picking up traction mostly thanks to everybody's new obsession >[...]

Aero-News: Quote of the Day (05.28.25)

"I think what is key, we have offered a bonus to air traffic controllers who are eligible to retire. We are going to pay them a 20% bonus on their salary to stay longer. Don't reti>[...]

ANN's Daily Aero-Term (05.28.25): Pilot Briefing

Aero Linx: Pilot Briefing The gathering, translation, interpretation, and summarization of weather and aeronautical information into a form usable by the pilot or flight supervisor>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC