Rockwell Collins Selected For KC-135 Block 45 Upgrade Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.19.25

Airborne-NextGen-05.20.25

AirborneUnlimited-05.21.25

Airborne-AffordableFlyers-05.22.25

AirborneUnlimited-05.23.25

Mon, Oct 12, 2009

Rockwell Collins Selected For KC-135 Block 45 Upgrade Program

Flight Deck Upgrade For Legacy Tanker Fleet

The U.S. Air Force has selected Rockwell Collins for the Engineering, Manufacturing and Development (EMD) phase of the KC-135 Block 45 cockpit upgrade program. Under the contract, Rockwell Collins will modernize the KC-135 refueling tankers flight deck with the latest generation autopilot, flight director, radar altimeter and electronic engine instrument display. Two prototype aircraft will be modified during the EMD phase to establish the production baseline for 415 additional KC-135 aircraft expected to receive the Block 45 upgrade. 
 
"The Block 45 upgrade continues Rockwell Collins' role in transforming the KC-135 by replacing obsolete components with the latest digital avionics technology for increased safety, efficiency and reliability," said Phil Jasper, vice president and general manager of Mobility and Rotary Wing Solutions for Rockwell Collins.  "As the prime contractor for the KC-135 Global Air Traffic Management (GATM) program we've had a very successful history of delivering these upgrades on time and on budget, which played an important role in winning this latest contract."

Rockwell Collins is providing the technology that ensures the KC-135 meets current and future Communication/Navigation/Surveillance and Air Traffic Management (CNS/ATM) requirements, allowing it to operate in commercial airspace throughout the world. Rockwell Collins has modified and delivered more than 300 GATM equipped KC-135 aircraft to date.

The Block 45 upgrade builds on this success by providing increased safety with a state-of-the-art autopilot system. The autopilot flight director system and upgrades to the flight management software provide the user with vertical navigation capabilities, increasing the already robust KC-135 navigational capabilities. The contract also calls for replacing the aging analog engine instruments with a large format color electronic engine instrument display.

FMI: www.rockwellcollins.com

Advertisement

More News

ANN's Daily Aero-Term (05.29.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Term (05.30.25): Very High Frequency (VHF)

Very High Frequency (VHF) The frequency band between 30 and 300 MHz. Portions of this band, 108 to 118 MHz, are used for certain NAVAIDs; 118 to 136 MHz are used for civil air/grou>[...]

Aero-News: Quote of the Day (05.30.25)

“From approximately November 2021 through January 2022, Britton-Harr, acting on behalf of AeroVanti, entered into lease-purchase agreements for five Piaggio-manufactured airc>[...]

Airborne 05.23.25: Global 8000, Qatar B747 Accepted, Aviation Merit Badge

Also: Virtual FLRAA Prototype, IFR-Capable Autonomous A/C, NS-32 Crew, Golden Dome Missile Defense Bombardier announced that the first production Global 8000 successfully completed>[...]

ANN's Daily Aero-Linx (05.30.25)

Aero Linx: The 1-26 Association (Schweizer) The Association’s goal is to foster the helpfulness, the camaraderie, and the opportunity for head-to-head competition that is fou>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC