NASA’s OIG Report On Management Of Mobile Launcher 2 Project | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Tue, Sep 03, 2024

NASA’s OIG Report On Management Of Mobile Launcher 2 Project

Second Launcher Needed For Larger Variants Of Space Launch System

The NASA Office of Inspector General (OIG) conducted an audit to determine how the agency was meeting its cost, schedule, and performance goals, and the actions the agency has taken to control future cost increases and schedule delays.

NASA’s Artemis series of space missions will use the Space Launch System (SLS) super heavy lift vehicle to launch the Orion Crew module into space. The SLS booster rockets and Orion are vertically assembled into a single spacecraft on top of the mobile launch platform inside the Vehicle Assembly Building. When complete, the mobile launcher with the spacecraft on top is moved to the launch pad. NASA has one mobile launcher, ML-1, for initial Artemis launches. A second, larger one, ML-2, is needed to handle larger SLS variants starting with the Artemis IV launch in 2028.

The prime contractor on the ML-2 is Bechtel National, Inc., of Reston, Virginia. They are responsible for design, engineering, fabrication, testing, and quality control. The initial contract in June 2019 was for $383 million with delivery to NASA slated for March 2023. However, by August 2022 the contract had increased to more than $1 billion and delivery was pushed back to May 2026. In June of this year, NASA set a commitment to Congress for a total cost of $1.8 billion but has struggled to incentivize improvement in contractor performance or to develop a reliable cost and schedule.

The OIG estimate that Bechtel’s costs will continue to rise and the ML-2 will not be delivered to NASA until spring 2029, well beyond the scheduled launch date of Artemis IV. NASA disagrees with this analysis; however, the agency did not establish an Agency Baseline Commitment until June of this year and lacked a cost and schedule estimate before that. As a result, costs and schedule estimates have changed several times, making it difficult for NASA to identify its funding needs, to measure project and contractor performance, or to be accountable to Congress.

The OIG audit is an interesting read and is available at the link below.

FMI:  oig.nasa.gov/

Advertisement

More News

ANN's Daily Aero-Term (05.05.25): Circle To Runway (Runway Number)

Circle To Runway (Runway Number) Used by ATC to inform the pilot that he/she must circle to land because the runway in use is other than the runway aligned with the instrument appr>[...]

ANN's Daily Aero-Linx (05.05.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

NTSB Prelim: De Havilland DHC-1

At Altitude Of About 250-300 Ft Agl, The Airplane Experienced A Total Loss Of Engine Power On November 6, 2024, at 1600 central standard time, a De Havilland DHC-1, N420TD, was inv>[...]

Classic Aero-TV: The Boeing Dreamliner -- Historic First Flight Coverage

From 2009 (YouTube Edition): Three Hour Flight Was 'Flawless' -- At Least, Until Mother Nature Intervened For anyone who loves the aviation business, this was a VERY good day. Afte>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC