New USAF Bomber Slated For 2022 Roll-Out | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Sat, May 28, 2022

New USAF Bomber Slated For 2022 Roll-Out

Northrop-Grumman Reports B-21 Proceeding Apace in Ground-Testing

Northrop Grumman stated that the public unveiling of its next-generation stealth bomber, the B-21 Raider, is still expected later this year.

The aircraft—an advanced, very long-range, heavy-payload, stealthy, intercontinental strategic bomber—is an integral component of the U.S. Air Force’s Long Range Strike Bomber (LRS-B) program. When complete, the B-21 will be able to deliver conventional and/or thermonuclear ordnance to targets anywhere in the world.

Expected to enter service in 2026, the B-21 Raider is to complement existing Rockwell B-1 Lancer, Northrop Grumman B-2 Spirit, and Boeing B-52 fleets already in U.S. service, and eventually replace these bombers.

Currently, six B-21s are in production, with the first aircraft having completed a series of ground-tests at Air Force Plant 42 in Palmdale, California. Subject tests included critical load-calibration assessments which encompassed configuring the aircraft’s instruments and verifying its structural integrity. Subsequent ground-testing comprised powering up the bomber, assessing its subsystems, and applying protective coatings and paint.

Northrop plans to carry out engine runs, and both low and high-speed taxi tests before the B-21 departs on its maiden flight from Palmdale to Edwards Air Force Base, where formal flight testing will commence.

Northrop’s confirmation of a 2023 first flight imparts a degree of certainty to a program thus-far hampered by delays. Original hopes for a December 2021 first flight of the new bomber went unrealized, and both Air Force and Northrop officials have subsequently become more cautious in their statements.

FMI: www.af.mil, www.northropgrumman.com

Advertisement

More News

ANN's Daily Aero-Term (05.05.25): Circle To Runway (Runway Number)

Circle To Runway (Runway Number) Used by ATC to inform the pilot that he/she must circle to land because the runway in use is other than the runway aligned with the instrument appr>[...]

ANN's Daily Aero-Linx (05.05.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

NTSB Prelim: De Havilland DHC-1

At Altitude Of About 250-300 Ft Agl, The Airplane Experienced A Total Loss Of Engine Power On November 6, 2024, at 1600 central standard time, a De Havilland DHC-1, N420TD, was inv>[...]

Classic Aero-TV: The Boeing Dreamliner -- Historic First Flight Coverage

From 2009 (YouTube Edition): Three Hour Flight Was 'Flawless' -- At Least, Until Mother Nature Intervened For anyone who loves the aviation business, this was a VERY good day. Afte>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC