USAF, NGC Craft Plan To Increase B-2 Operational Availability | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.04.24

Airborne-NextGen-11.05.24

Airborne-Unlimited-11.06.24

Airborne-FlightTraining-11.07.24

Airborne-Unlimited-11.08.24

Fri, Sep 18, 2015

USAF, NGC Craft Plan To Increase B-2 Operational Availability

Also Aims To Reduce Fleet Sustainment Costs Under New Maintenance Agreement

The U.S. Air Force expects to increase the number of B-2 stealth bombers available for combat by one full jet and reduce fleet sustainment costs significantly under a new maintenance agreement worked out with B-2 prime contractor Northrop Grumman Corporation.

Under the contract modification signed in April, Northrop Grumman will give each B-2 a major, end-to-end overhaul – a process called programmed depot maintenance (PDM) – once every nine years. Each jet currently undergoes PDM once every seven years. The PDM process, which includes a complete restoration of the jet's exterior surfaces, is performed at the company's Aircraft Integration Center of Excellence in Palmdale.

"This new approach to B-2 maintenance is a win-win for the Air Force and the nation," said Brig. Gen Eric Fick, Program Executive Officer for Fighters and Bombers within the Air Force Life Cycle Management Center, Wright Patterson AFB, Ohio. "It will enhance the jet's readiness to conduct global security missions, and is expected to save taxpayers about $900 million in maintenance costs over the life of the fleet."

"The nine-year PDM cycle is part of an aggressive on-going effort by Northrop Grumman and the Air Force to increase bomber availability," said Pat McMahon, sector vice president and general manager for military aircraft systems, Northrop Grumman Aerospace Systems. "Our experienced work force has critically reviewed every PDM material and process for potential improvements. As a result, we've been able to reduce the length of the PDM process, and increase the time between PDM periods."

Bolstered by the adoption of USAF best practices used by other Northrop Grumman programs, the new nine-year overhaul cycle will reduce the average length of B-2 PDM to 365 days, down from more than 400 days in previous years. Under the new rhythm, Northrop Grumman will induct a B-2 into PDM approximately once every six months.

"Our delivery of the B-2 Spirit of Ohio back to the Air Force in August marked the last time we expect to have more than two jets in PDM at any one time," said McMahon. "Fewer jets undergoing PDM in Palmdale will keep more B-2s ready to serve the nation's security needs."

(USAF images)

FMI: www.af.mil

Advertisement

More News

ANN's Daily Aero-Linx (11.04.24)

Aero Linx: The Aviation Museum of Kentucky, Inc. Since its founding in 1978, members of the Kentucky Aviation History Roundtable have dreamed of an aviation museum. To this end, th>[...]

Classic Aero-TV: Composite-FX Sets Elevates the Personal Helicopter Market

From Oshkosh 2023 (YouTube Edition): The Mosquito Evolves Formerly known as Mosquito, Trenton, Florida-based Composite FX is a designer and manufacturer of personal kit and factory>[...]

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

NTSB Final Report: Airborne Windsports Edge X

The Non-Certificated Pilot’s Loss Of Control For Undetermined Reasons... Analysis: The airplane was observed flying around the area at an unknown time on the day of the accid>[...]

ANN's Daily Aero-Term (11.04.24): LORAN

LORAN An electronic navigational system by which hyperbolic lines of position are determined by measuring the difference in the time of reception of synchronized pulse signals from>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC