USAF, NGC Craft Plan To Increase B-2 Operational Availability | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.08.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Fri, Sep 18, 2015

USAF, NGC Craft Plan To Increase B-2 Operational Availability

Also Aims To Reduce Fleet Sustainment Costs Under New Maintenance Agreement

The U.S. Air Force expects to increase the number of B-2 stealth bombers available for combat by one full jet and reduce fleet sustainment costs significantly under a new maintenance agreement worked out with B-2 prime contractor Northrop Grumman Corporation.

Under the contract modification signed in April, Northrop Grumman will give each B-2 a major, end-to-end overhaul – a process called programmed depot maintenance (PDM) – once every nine years. Each jet currently undergoes PDM once every seven years. The PDM process, which includes a complete restoration of the jet's exterior surfaces, is performed at the company's Aircraft Integration Center of Excellence in Palmdale.

"This new approach to B-2 maintenance is a win-win for the Air Force and the nation," said Brig. Gen Eric Fick, Program Executive Officer for Fighters and Bombers within the Air Force Life Cycle Management Center, Wright Patterson AFB, Ohio. "It will enhance the jet's readiness to conduct global security missions, and is expected to save taxpayers about $900 million in maintenance costs over the life of the fleet."

"The nine-year PDM cycle is part of an aggressive on-going effort by Northrop Grumman and the Air Force to increase bomber availability," said Pat McMahon, sector vice president and general manager for military aircraft systems, Northrop Grumman Aerospace Systems. "Our experienced work force has critically reviewed every PDM material and process for potential improvements. As a result, we've been able to reduce the length of the PDM process, and increase the time between PDM periods."

Bolstered by the adoption of USAF best practices used by other Northrop Grumman programs, the new nine-year overhaul cycle will reduce the average length of B-2 PDM to 365 days, down from more than 400 days in previous years. Under the new rhythm, Northrop Grumman will induct a B-2 into PDM approximately once every six months.

"Our delivery of the B-2 Spirit of Ohio back to the Air Force in August marked the last time we expect to have more than two jets in PDM at any one time," said McMahon. "Fewer jets undergoing PDM in Palmdale will keep more B-2s ready to serve the nation's security needs."

(USAF images)

FMI: www.af.mil

Advertisement

More News

NTSB Prelim: Lancair NLA-275-FR-C

About 2132 And At 11,800 Ft MSL, The Airplane Began A Rapid Right Spiraling Descent On August 18, 2025, about 2133 central daylight time, a Lancair NLA-275-FR-C airplane, N345LA, w>[...]

ANN's Daily Aero-Linx (09.12.25)

Aero Linx: The Collings Foundation The Collings Foundation is a non-profit, Educational Foundation (501(c)3), founded in 1979. The purpose of the Foundation is to preserve and exhi>[...]

Aero-News: Quote of the Day (09.12.25)

"This first FAA certification enables us to address the pilot shortage crisis with modern training solutions. Flight schools need alternatives to aging fleets with 40-year-old desi>[...]

ANN's Daily Aero-Term (09.12.25): North Atlantic High Level Airspace (NAT HLA)

North Atlantic High Level Airspace (NAT HLA) That volume of airspace (as defined in ICAO Document 7030) between FL 285 and FL 420 within the Oceanic Control Areas of Bodo Oceanic, >[...]

Aero-News: Quote of the Day (09.13.25)

“HITRON embodies the Coast Guard’s spirit of innovation and adaptability. From its humble beginnings as a prototype program, it has evolved into a vital force in our co>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC