Enstrom Begins Production For Royal Thai Army Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Mar 08, 2011

Enstrom Begins Production For Royal Thai Army Aircraft

First Three Of 16 480Bs Completed

The first three of a contracted sixteen 480B advanced turbine training helicopters for the Royal Thai Army have been completed at the Enstrom factory. The aircraft have been equipped with a number of advanced features, including NVG compatible cockpits, Chelton EFIS systems, and dual Wulfsberg RT-5000 tactical radio systems.

"These represent some of the most advanced aircraft we have built to date," commented Enstrom's Director of Engineering, Bill Taylor. "That we were able to get them engineered and into production so quickly is a testament to our team in Menominee, and our support from the FAA's Chicago Aircraft Certification Office. The Royal Thai Army is going to have some very capable helicopters."

The 480B was selected in a competitive bidding process that included aircraft from 7 different major manufacturers.  Aircrew and maintenance personnel training is scheduled to begin in March, with aircraft deliveries following soon after.

Enstrom is represented in Asia by Blake & DeJong Ltd., and in Thailand by M-Landarch Inc.

FMI: www.enstromhelicopter.com, www.m-landarch.com

Advertisement

More News

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

NTSB Prelim: Rutan Long-EZ

The Pilot Attempted Several Times To Restart The Engine And Diverted To Long Beach Airport/Daughtery Field On October 20, 2025, about 1603 Pacific daylight time, an experimental am>[...]

ANN's Daily Aero-Term (12.05.25): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (12.05.25)

"The latest development underscores the government of Malaysia’s commitment in providing closure to the families affected by this tragedy..." Source: From statements made by >[...]

Airborne-Flight Training 12.04.25: Ldg Fee Danger, Av Mental Health, PC-7 MKX

Also: IAE Acquires Diamond Trainers, Army Drones, FedEx Pilots Warning, DA62 MPP To Dresden Tech Uni The danger to the flight training industry and our future pilots is clear. Dona>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC