Modernization Work Begins In Naples On G.222s For Afghanistan | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-08.25.25

Airborne-NextGen-08.26.25

AirborneUnlimited-08.27.25

Airborne-AffordableFlyers-08.28.25

AirborneUnlimited-08.22.25

Tue, Nov 04, 2008

Modernization Work Begins In Naples On G.222s For Afghanistan

Predecessors To Today's Spartans Refurbished With New Avionics, Interiors

The refurbishment and modernization of 18 G.222s, purchased by the United States Air Force and destined for the re-established Afghan Air Force, has begun at Alenia Aeronautica’s Capodichino plant in Naples.

On September 30, Alenia North America signed a $287 million contract to provide 18 refurbished and modernized G.222 aircraft. The aircraft were previously in service with the Italian Air Force and reacquired by Alenia Aeronautica in conjunction with the Italian Air Force’s acquisition of a new fleet of C-27J Spartans.

The aircraft are to be modernized at Capodichino with state of the art avionics and general improvements according to the specific requirements of the United States Air Force. Two of these craft will be outfitted for a VIP soundproof module and equipped with seats, desks and a pantry so as to be used for the transport of Afghan leaders.

Four G.222s, sent from Pisa and Pratica di Mare air bases, have already arrived at Capodichino to begin the refurbishment and modernization process. The eighteen G.222s to be provided to the Afghan National Army Air Corps were produced between 1977 and 1985 in several avionic and cockpit configurations. As part of the modernization effort, all 18 will be upgraded to a standard avionic and system configuration, with a new autopilot system, ballistic protection and new maintenance operations. The refurbishment and modernizations are anticipated to last between 12 and 15 months per aircraft.

The first refurbished and modernized G.222 will be delivered to the Combined Security Transition Command in Afghanistan halfway through 2009 and the entire supply will be complete by 2011.

Today's version of the G.222, the C-27J Spartan, was recently selected by the US Army and Air Force for the Joint Cargo Aircraft (JCA) Program.

FMI: www.aleniana.com/

Advertisement

More News

ANN's Daily Aero-Linx (08.27.25)

Aero Linx: The American Society of Aerospace Medicine Specialists (ASAMS) The Society is a non-profit organization created to serve as a voice for and represent the professional ne>[...]

ANN's Daily Aero-Term (08.27.25): Class C Service

Class C Service This service provides, in addition to basic radar service, approved separation between IFR and VFR aircraft, and sequencing of VFR aircraft, and sequencing of VFR a>[...]

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Airborne-NextGen 08.26.25: Iran UAV Knockoffs, X-37B Spaceplane, Army Training

Also: ERAU Uses UAVs, P550 Group 2 UAS, Starship’s Florida Launches, NASA Missions Chopped The Air Force has put out a call to commission a one-to-one copy of the Iranian-des>[...]

Classic Klyde Morris (08.25.25)

Classic Klyde Morris From 11.07.16 (and Remembering Bob...) FMI: www.klydemorris.com>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC