Aircraft Carrier John F. Kennedy Reaches 75 Percent Structural Completion | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Tue, May 08, 2018

Aircraft Carrier John F. Kennedy Reaches 75 Percent Structural Completion

New Nuclear Carrier Scheduled For Launch In 2020

The Newport News Shipbuilding division of Huntington Ingalls Industries has built 70 percent of the structures necessary to complete the nuclear-powered aircraft carrier John F. Kennedy (CVN 79), the company said recently.

Like its predecessor, the first-in-class USS Gerald R. Ford (CVN 78), Kennedy is being built with a modular construction technique where smaller sections of the ship are welded together to form larger structures called superlifts. The superlifts are pre-outfitted and hoisted into Dry Dock 12—where the ship is being built—by the company’s 1,050-metric ton gantry crane.

Shipbuilders have successfully erected 317 lifts since the ship’s keel was laid in August 2015. Kennedy is on track to be completed with 447 total lifts.

The recent 806-metric ton superlift consisted of 17 individual units and was about 171 feet long and about 92 feet wide. The structure comprises berthing areas, electrical equipment rooms and workshops and took 18 months to build.

“This superlift is in the forward part of the ship, about halfway between the bow and midship,” said Mike Butler, program director of CVN 79. “It represents one of the key build strategy changes for Kennedy: building superlifts that are larger and more complete before they are erected on the ship. We are pleased with how construction on the Kennedy is progressing, and we look forward to additional milestones as we inch closer to christening of the ship.”

Kennedy is scheduled to launch in 2020.

(Image provided with Huntington Ingalls Industries news release)

FMI: www.huntingtoningalls.com

Advertisement

More News

Classic Aero-TV: Up Close And Personal - The Aeroshell Aerobatic Team at Oshkosh

From 2014 (YouTube Version): One Of The Airshow World's Pre-Eminent Formation Teams Chats About The State Of The Industry At EAA AirVenture 2014, ANN News Editor Tom Patton gets th>[...]

ANN's Daily Aero-Term (07.13.25): Tactical Air Navigation (TACAN)

Tactical Air Navigation (TACAN) An ultra-high frequency electronic rho-theta air navigation aid which provides suitably equipped aircraft a continuous indication of bearing and dis>[...]

ANN's Daily Aero-Linx (07.13.25)

Aero Linx: Doobert Hi, we're Chris & Rachael Roy, founders and owners of Doobert. Chris is a technology guy in his “day” job and used his experience to create Doobe>[...]

NTSB Prelim: Pitts S2

The Airplane Was Spinning In A Nose-Down Attitude Before It Impacted Terrain On June 20, 2025, at 0900 eastern daylight time, a Pitts Aerobatics S-2B, N79AV, was destroyed when it >[...]

Airborne 07.09.25: B-17 Sentimental Journey, Airport Scandal, NORAD Intercepts

Also: United Elite Sues, Newark ATC Transitions, Discovery Moves?, Textron @ KOSH The Commemorative Air Force Airbase Arizona is taking its “Flying Legends of Victory Tour&rd>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC