Second Fire Scout Delivered | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, May 20, 2003

Second Fire Scout Delivered

Seaborne Tests Imminent

The U.S. Navy has moved one step closer to operational capability for its RQ-8A Fire Scout vertical
takeoff and landing tactical unmanned aerial vehicle (UAV) with the on-time delivery of the second production unit by Northrop Grumman.

The company's Integrated Systems sector delivered the air vehicle April 14 to the Navy's Webster Field UAV test facility, Naval Air Station Patuxent River (MD).

"Delivering the second Fire Scout production vehicle is an important and necessary step on the path to demonstrating the system's distinctive technical capabilities, such as landing aboard a ship," said Scott Winship, Northrop Grumman's Fire Scout program manager.

The Fire Scout production vehicles are integrated and tested at Integrated Systems' Unmanned Systems unit in San Diego (CA). The second vehicle was rolled out April 4.

The Navy and Northrop Grumman began the Fire Scout's so-far flawless flight test program in May of last year. To date, the development team has conducted 40 consecutive successful flight tests. The team is currently making preparations to begin land-based takeoff and recovery flight-testing with the UAV Common Automatic Recovery System and Tactical Control System in early summer. This testing is a precursor to shipboard testing later this summer on the USS Denver Amphibious Transport Dock (LPD-9) off the coast of San Diego.

FMI: www.northropgrumman.com; www.is.northropgrumman.com; www.denver.navy.mil

Advertisement

More News

ANN's Daily Aero-Term (12.08.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

ANN's Daily Aero-Linx (12.08.25)

Aero Linx: T-34 Association, Inc. The T-34 Association was formed in July 1975 so that individuals purchasing then military surplus T-34As had an organization which would provide s>[...]

NTSB Final Report: Piper PA-31T3

As He Released The Brakes To Begin Taxiing, The Brake Pedals Went To The Floor With No Braking Action Analysis: The pilot reported that during engine start up, he applied the brake>[...]

Aero-News: Quote of the Day (12.08.25)

“Legislation like the Mental Health in Aviation Act is still imperative to hold the FAA accountable for the changes they clearly acknowledge need to be made... We cannot wait>[...]

Airborne-Flight Training 12.04.25: Ldg Fee Danger, Av Mental Health, PC-7 MKX

Also: IAE Acquires Diamond Trainers, Army Drones, FedEx Pilots Warning, DA62 MPP To Dresden Tech Uni The danger to the flight training industry and our future pilots is clear. Dona>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC