Air Force Could Split Tanker Deal, Says Official | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, Feb 19, 2008

Air Force Could Split Tanker Deal, Says Official

Notes Upcoming Decision Is Only For Phase One Of KC-X

In the heated competition between Boeing and a Northrop Grumman/EADS venture for the US Air Force's new aerial tanker contract, both sides -- and the analysts who watch the industry -- have talked about the contract being worth up to $40 billion to the winner, by the time all three phases of acquisition are complete.

Contrary to past reports, however, some Air Force officials now say that's not a sure bet -- and that phases two and three of the KC-X tanker competition may be split between the two designs.

As ANN has reported, the Air Force is considering the Boeing KC-767 and the Northrop/EADS KC-30 for the first phase of a contract to replace the Air Force's KC-135 Stratotanker fleet -- which averages 44 years old. The service may announce as soon as February 25 which design will be selected.

Both aircraft are based heavily on commercial planes -- Boeing's 767 and the Airbus A330, respectively -- and each has its strengths. The KC-767 is cheaper, though smaller; the KC-30 offers more cargo room and fuel capacity, but at a price premium.

Air Force Lieutenant General Donald Hoffman is the Air Force's top uniformed acquisitions official. He told Bloomberg the phase 1 winner won't necessarily have an advantage in phases 2 and 3, contrary to past indications of the Air Force's reluctance to split the deal.

"They can say whatever they want, but we have three separate buys as our acquisition strategy at this point," he said.

That runs contrary to statements made just last year by Sue Payton, the Assistant Secretary of the Air Force for Acquisition... who said splitting the deal would prove too costly, at a time when the service is having to keep close eye on its budgets.

"Because we are trying to do so much, we don't have the money upfront that it would take to carry two or three [tankers] through development and then into procurement," she said in August 2007.

Hoffman begs to differ. He told reporters at the Pentagon the service won't even have specifications for the second phase until at least 2010.

FMI: www.af.mil, www.globaltanker.com, www.boeing.com, www.eadsnorthamerica.com, www.northropgrumman.com/kc30/

Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC