NBAA Efforts Helped Lessen Impact Of Upper Midwest Airspace Changes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Sat, Aug 22, 2015

NBAA Efforts Helped Lessen Impact Of Upper Midwest Airspace Changes

Changes Coming In September

A significant revision to airspace over the upper Midwest will take place in September, but its effects on business aircraft operators should be minimal, thanks in part to engagement efforts by NBAA.

Nearly eight years in development, the massive Powder River Training Complex (PRTC) will ultimately encompass 28,000 square miles over portions of Montana, North Dakota, South Dakota and Wyoming. The complex provides a training area for U.S. Air Force bombers operating from Ellsworth and Minot Air Force Bases, enabling those crews and other aircraft to simulate readiness operations over hostile areas.

"We've engaged on these issues from the time the PRTC was first proposed in 2007," said Bob Lamond, NBAA’s director of air traffic services and infrastructure. "The initial proposal was extremely onerous to all of aviation, but thanks to close work between military officials, industry stakeholders and the FAA, the final plan is much more palatable to our community, with priority given to civil IFR aircraft arriving or departing from airports under the footprint of the airspace.”

The final PRTC modifies the existing Powder River A and B military operations areas (MOAs) and associated airspace into 18 MOAs, with an additional 12 sections available for expansion when needed. Three, 8-mile wide corridors (called "gaps") will provide flight paths between the training areas for civil VFR and IFR traffic, with much of the airspace separated into low-altitude and high-altitude areas so that operations may be conducted while minimizing impact to civilian flights.

The Air Force is implementing a dedicated communications network to recall aircraft operating at low altitudes to accommodate scheduled IFR arrivals and departures into local airports. Service officials also worked to reduce the impact from large-force exercises (LFE) conducted in the PRTC, with a final agreement for a maximum of 10 LFE days per year and one LFE per quarter, lasting no more than three days at a time.

NBAA Northwest Regional Representative Kristi Ivey that she and Lamond conducted extensive outreach to NBAA Members and other stakeholders in the affected areas. Lamond also gave presentations about the PRTC's potential impact at the Montana Aviation Conference earlier this year, and at the 2014 South Dakota Airports Conference.

"We communicated thoroughly with our Members, and presented their statements and concerns in our meetings with officials," Ivey added. "In particular, the Montana Aeronautics Division worked heavily with us to advocate on behalf of general aviation interests."

Operations in the PRTC are forecast to save the Air Force an estimated $24 million a year, and nearly 5,000 hours of flight time – important considerations for the aging U.S. bomber fleet.

"It is a win from the standpoint that we are able to effectively support the Department of Defense requirements for special-use airspace," said John Witucki, project lead for the FAA's Central Service Area, adding that the end result is "a balanced design ensuring aviation access while mitigating environmental impacts and meeting Air Force training mission requirements."

FMI: FAA Powder River Record of Decision

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC