Final Gulfstream G200 Rolls Off Production Line | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.21.25

Airborne-Unlimited-07.22.25

AirborneUnlimited-07.23.25

Airborne-Unlimited-07.24.25

AirborneUnlimited-07.25.25

Wed, Dec 21, 2011

Final Gulfstream G200 Rolls Off Production Line

250th Business Jet Set For December Delivery

Capping a 14-year production run, the last Gulfstream G200 business jet – the 250th – has rolled off the production line in Dallas. It will be replaced in the Gulfstream fleet by the Gulfstream G280, which is scheduled to enter service in the first part of 2012.

The G200 was the first 'super mid-size' business jet to enter the marketplace. It rolled out in 1997 and was certified by the FAA in 1998. Seven years ago today, Gulfstream delivered the 100th G200. To date, the aircraft has been certified in 18 countries and has a dispatch reliability rate in excess of 99 percent. The fleet has flown more than 581,000 flight hours and completed more than 351,000 take-offs and landings. Originally introduced as the “Galaxy” by Galaxy Aerospace (which was acquired by Gulfstream in 2001), the G200 was manufactured by Israel Aircraft Industries in Tel Aviv and then flown to Gulfstream’s Mid-Cabin Completions Center in Dallas for interior outfitting and paint. The last G200 is scheduled for customer delivery later this month.

“The G200 took the basic cabin dimensions of a large-cabin aircraft and made them available to a broader market by offering a shortened eight- to 10-place, two-seating-area layout with solid transcontinental U.S. range,” said Stan Dixon, vice president, Mid-Cabin Programs, Gulfstream. “It led the category for its time, as will the G280 going into the future.”

While G200 production has ended, the company says its product support organization will ensure adequate parts, tooling, sustaining engineering and people are available to continue providing support for the worldwide G200 fleet. (Photo provided by Gulfstream)

FMI: www.gulfstream.com

Advertisement

More News

OSH25 Day 5 Redux: Avidyne Vantage 12, Is Fly-Inn An AeroBnB?, B25 Miss Mitchell

Also: Pratt & Whitney 747SP, Gratia Aero, Robinson/MagniX, Jack Pelton Part5 The Avidyne Vantage 12 is finally certified and will shortly be shipping out so that aging Cirrus a>[...]

ANN's Daily Aero-Linx (07.29.25)

Aero Linx: Army Aviation Medicine Association (AAVMA) The Society of US Army Flight Surgeons (SoUSAFS) serves to advance the science and art of Aerospace Medicine and its allied sc>[...]

NTSB Final Report: Curtiss Wright P-40E

Witnesses Reported That They Heard A Loss Of Engine Power Analysis: Witnesses reported that the airplane departed from runway 35 after a successful runup. During the initial climb,>[...]

ANN's Daily Aero-Term (07.29.25): Radio Magnetic Indicator

Radio Magnetic Indicator An aircraft navigational instrument coupled with a gyro compass or similar compass that indicates the direction of a selected NAVAID and indicates bearing >[...]

Aero-News: Quote of the Day (07.29.25)

"After exiting, I had a vague recollection of what just happened…and a much clearer view of how quickly hypoxia can sneak up. Sign-ups for PROTE are open each day of AirVent>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC