The Changes Are Blowin' In The Wind | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Thu, May 27, 2004

The Changes Are Blowin' In The Wind

Boeing 7E7 Wind Tunnel Testing Refines Configuration

Boeing is proceeding with the second round of wind tunnel tests for its all-new 7E7 Dreamliner at four locations around the world as it works toward finalizing the passenger airplane's configuration early next year.

In addition to its own high-speed facility in Seattle, Boeing is using the QinetiQ low-speed wind tunnel in Farnborough, England; the National Aeronautics and Space Administration (NASA) Ames facility in Mountain View, (CA) and the University of Washington low-speed wind tunnel, also in Seattle.

"No one in the world does advanced aerodynamics as well as Boeing, said Chief Project Engineer Tom Cogan. "It is a core competency that allows us to create the airplanes that our customers want.

Boeing has refined its computational fluid dynamics methods since designing its 777 airplane during the early 1990s, allowing designers to optimize an aircraft's shape to achieve the highest efficiency.

In the past, Boeing has taken as many as 60 wing designs into wind tunnels for testing. For the 7E7, it will take fewer than a dozen.

"We are more efficient throughout the design effort, said Cogan. "It's another way we are controlling costs. We continue to find that our computation fluid dynamics (CFD) programs are extremely accurate in predicting the performance of our design.

Advanced aerodynamics is one of four characteristics contributing to the 7E7's dramatic improvements in fuel efficiency. The airplane will use 20 percent less fuel per passenger as compared to other airplanes in its class.

In addition to improving airplane performance and team efficiency, computational fluid dynamics and wind tunnel testing contribute to safety, the ultimate design goal.

More than 15,000 hours of wind tunnel time will be logged to develop the 7E7.

Certification and entry into service for the 7E7 is planned for 2008.

FMI: www.boeing.com

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC