SNC Selected For Phase Three Order To Aid Pilots In Degraded Visual Environment | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Nov 01, 2015

SNC Selected For Phase Three Order To Aid Pilots In Degraded Visual Environment

Utilizes Multi-Sensor See-Through Imaging System To Present Hi-Res images

Sierra Nevada Corporation (SNC) has been awarded a task order for the next phase of development for its Degraded Visual Environment Pilotage System (DVEPS). The indefinite-delivery/indefinite-quantity (IDIQ) contract with the United States Special Operations Command Technology Applications Contracting Office was initially awarded in 2013 to increase the safety of military aircrews worldwide.

SNC’s DVE Pilotage System will allow pilots to safely operate in degraded visual environments such as brownout, smoke, sand, snow, rain and fog conditions through the use of a multi-sensor, see-through imaging system that provides real-time, high-resolution fused imagery of the terrain and obstacles. This multi-aircraft, game-changing technology will increase aircrew situational awareness of obstacles throughout all phases of flight including people, power lines, ditches, mountains, rocks and other obstacles, reducing loss of life and equipment.

SNC was competitively selected for the third phase task order following a successful airborne test of its DVEPS program at the Yuma Proving Grounds in Arizona in June 2015. This airborne test demonstrated SNC’s ability to fuse multi-sensor data into real-time, high-fidelity imagery during operations in DVE conditions. The final contract phase includes Integrated System Development/Demonstration, Low-Rate Production and Qualification testing. The effort will begin in fiscal year 2016 with Developmental Flight Testing, leading to a Milestone C decision followed by Low-Rate Initial Production to support Qualification and Operational Testing.

“It is a great honor to have been selected for the third phase of this important life-saving and mission enabling program that will provide agile, flexible and economical technology to our country’s military.” said Greg Cox, corporate vice president for SNC’s Communication, Navigation and Surveillance/Air Traffic Management business area  “DVEPS combines unmatched performance in a reduced Size, Weight and Power (SWaP) envelope, creating a superior system that was unavailable at the start of the program. We look forward to finalizing this phase of the contract, leading to a Full-Rate Production decision in fiscal year 2017/2018.”

FMI: www.sncorp.com

Advertisement

More News

Classic Aero-TV: VerdeGo Debuts VH-3 Hybrid-Electric Powerplant

From 2023 (YouTube Edition): New Propulsion Scheme Optimized for AAM Applications Founded in 2017 by Eric Bartsch, Pat Anderson, and Erik Lindbergh (grandson of famed aviation pion>[...]

NTSB Prelim: Grumman American Avn. Corp. AA-5B

During The Initial Climb, The Engine Began To Operate Abnormally And, After About Three Seconds, Experienced A Total Loss Of Power On October 29, 2025, about 1820 Pacific daylight >[...]

ANN's Daily Aero-Linx (12.02.25)

Aero Linx: Women in Aviation International Women in Aviation International is the largest nonprofit organization that envisions a world where the sky is open to all, and where avia>[...]

Aero-News: Quote of the Day (12.02.25)

“We’ve paid for the cable line’s repair for the customer and have apologized for the inconvenience this caused them...” Source: Some followup info from an A>[...]

Aero-News: Quote of the Day (12.03.25)

“We have long warned about the devastating effects of pairing optimization. Multiple times over many months, we highlighted how schedule manipulation, unbalanced schedules, a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC